1、 25米高悬挑式扣件式钢管脚手架设计与搭拆施工要求1 设计与施工依据 国家行业标准建筑施工扣件式钢管脚手架(JGJ130-2001) 国家行业标准建筑施工安全检查标准(JGJ59-99) 建设部建筑管理司组织编写建筑施工安全检查标准实施指南2001.5 国标钢结构设计规范(GBJ17-88)2 悬挑式脚手架的主要配件及材料选用水平挑梁:16a号工字钢。扣件式钢管脚手架的主要组成构件有:立柱、纵向水平杆(大横杆)、横向水平杆(小横杆)、扣件、脚手板、剪刀撑(十字撑)、横向支撑(横向斜拉杆)、连墙件、纵向扫地杆、横向扫地杆。材料选用48mm,厚3.5mm的钢管,木脚手板和18cm高木制踢脚板。钢材
2、强度等级Q235。3 搭设方式与主要参数脚手架用483.5钢管和扣件搭设成双排架,其横距为1.2m,纵距为1.5m,步距为1.5m。脚手架立杆下部支撑在用16号工字钢制作的水平悬挑梁上。脚手架搭设高度共15步,计25m高。里立杆离墙面0.4m;施工作业层按2层设计,每层活荷载为3KN/m2,作业层设栏杆和档脚板;脚手架外立杆里侧挂密目安全网封闭施工;剪刀撑应在外侧立面整个长度与高度上连续设置;其他搭设要求遵照JGJ130-2001执行。4 荷载取值与组合4.1脚手架结构自重(包括立柱、纵、横向水平杆、扣件、剪刀撑和横向斜撑): 查(JGJ130-2001)规范(以下简称规范)表A-1得: NG
3、IK=250.1248=3.12KN 4.2构、配件自重(1) 外立杆 木脚手板,两层一步木脚手板,单位荷载重按0.10KN/m2计:NG2K-1=(51.21.50.10)/2=0.45KN 栏杆、挡脚板(挡脚板按3层设计)查表4.2.1-2NG2K-2=30.141.5+221.50.0384+220.0132=0.9132KN 安全网NG2K-3=251.50.01=0.375KN 合计NG2K=0.3938+0.9132+0.375=1.682KN(2) 内立杆 木脚手板NG2K-1=51.21.50.10/2+0.31.520.10=0.54KN 纵向横杆NG2K-2=221.50.
4、0384+220.0132=0.2832KN 合计 NG2K=0.4838+0.2832=0.7670KN4.3施工荷载 外立杆 NQK=21.51.23/2=5.4KN 里立杆 NQK=4.725+0.31.523=7.425KN4.4垂直荷载组合 外立杆 N1=1.2(2.2462+1.682)+1.44.725=11.3291KN 里立杆 N2=1.2(2.2464+0.767)+1.47.425=14.0111KN5 水平悬挑梁设计N3N2 qN1 200 1400 350 1050 100 计算简图 最大弯距 M=11.3291.45+14.01110.4+0.2051.21.552
5、/2=22.327KNm选用16号I字钢:WX=140.9cm3,I=1127mm4 自重q=0.205KN/m根据钢结构设计规范(GBJ17-88)个规范,轧制普通工字钢受弯要考虑整体稳定问题。按附录一之(二),本悬臂梁跨长1.45m折算成简支梁,其跨度为21.45m,查附表1.3用插入发求得b=1.380.6,改查表1.2,得=0.8514。则悬挑梁弯曲应力为:f=21.626106/(0.8514140.9103)=180.27N/mm2205 N/mm2 ,安全。挠度= N1I3/3EI+ N2a2(3I-a)/6EI =(1132914503)/(32.061051127104)+(
6、14011.1400)(31450-4002)/(62.061051127104) =4.959+0.636=5.59mm21450/400=7.25mm,可以.16号I字钢后部锚固钢筋设计N3=22.144/1.4=15.817KN锚筋选用16圆钢,吊环拉力(设计值)为:=15.817103/(20.785162)=39.35N/mm2小于吊环控制应力50N/ mm2。安全。 结论:当挑梁用16号I字钢,为保证施工安全,在工字钢上设一斜拉钢丝绳,间距隔一拉一,直径10钢丝绳加花篮螺栓。6 立杆强度及稳定性计算无风荷载时,立杆最大垂直力为14.011KN 立杆步距 1.5m 立杆计算长度,根据
7、第5.3.3条规定:I0=1.1551.5150=259.8cm则细长比 =259.8/1.58=164.5查附录c,=0.185立杆轴向压应力f=14011/(0.185489)=154.88N/mm2205 N/mm2,安全在风荷载作用下,外力杆稳定性计算 建筑物最大高度按100m计,最后一组挑架假设从100-101.5=85m开始搭设,此情况立杆垂直力最大,相应风载也大。基本风载 0.55KN/m2,高度变化系数(B类)2.006查表A-3,敞开式脚手架的挡风面积为1.51.50.089=0.2m2密目网的挡风系数取0.5,则在脚手架外立杆里侧满挂密目网后,脚手架综合挡风面积为:(1.5
8、1.5-0.2)0.5+0.20=1.225 m2其综合挡系数为=1.225/(1.51.5)=0.5444查规范表4.24,背靠开洞墙、满挂密目网的脚手架风载体性系数为1.3,则 脚手架所承受风载标准值为0.70.552.006(1.30.5445)=0.5467KN/m 由风载设计值产生的外力杆弯距(据公式5.34) MW=0.851.40.54671.51.51.5/10=0.219KNm组合风载后外力杆压弯应力 f=11202.8/(0.185489)+0.219106 /(5.08103)=166.91 N/mm2205 N/mm2,安全7 连墙件设计按照常规的做法连墙件二端分别用一
9、个扣件与立杆和墙体埋件连接,按照规范(5.4.1)公式进行多次试算,一个构件所传递轴向力设计值均大于表5.1.7所列一个直扣件、旋转扣件的抗滑承载力设计值8KN ,故决定采用2个扣件进行连接,即连墙杆一侧分别与里、外立杆同时连接,另一侧在建筑物的内、外墙面各加两只直角扣件扣紧。脚手架高度在50m以下,采用两只扣件连接时,连墙件按3步2跨设置,连墙件的轴向力设计值按公式5.4.1计算为:W50=1.40.70.55(1.30.5445)1.67(5.43)+5=15.32KN16KN,安全本工程连墙件采用脚手管与框架柱刚性连接,详见前面文字部分;8 脚手架的构造8.1立柱构造的要求:立柱接头必须
10、采用对接扣件对接,对接应符合以下要求:立柱上的对接扣件应交错布置,两个相临的立柱接头在高度方向错开的距离不应小于500mm;各接头中心距主节点的距离不应大于步距的1/3。8.2纵向水平杆构造要求: 纵向水平杆设置在横向水平杆之上,并以直角扣件扣紧在横向水平杆上。纵向水平杆在操作层的间距不宜大于400mm。 纵向水平杆的长度一般不宜小于三跨,并不小于6m。 纵向水平杆一般宜采用对接扣件连接,对接接头应交错布置,不应设在同步、同跨内,相临接头水平距离不应小于500mm,并应避免设在纵向水平杆的跨中。端部扣件盖板边缘距杆端的距离不应小于100mm。8.3 横向水平杆的构造要求: 双排架的横向水平杆两
11、端采用直角扣件固定在立柱上,靠墙一侧的外伸长度一般为400mm。9 剪刀撑与横向支撑的构造要求:沿脚手架纵向两端和转角处起,在脚手架外侧面整个长度与高度用斜杆搭成剪刀撑,自下而上循序连续设置。每道剪刀撑跨越立柱的根数宜在5-7根之间。每道剪刀撑宽度不应小于4跨,且不小于6m,斜杆与地面的倾角宜在45度-60度之间。剪刀撑斜杆的接头必须采用搭接,搭接长度不小于1m,并用不少于2个旋转扣件扣紧。剪刀撑斜杆应用旋转扣固定在与之相交的横向水平杆的伸出端或立柱上,旋转扣件中心线距主节点的距离不应大于150mm。一字型、开口型双排脚手架的两端必须设置横向支撑,中间宜每隔6跨设置一道。10悬挑式脚手架搭设:
12、 根据建筑物外形,在建筑物平面图上布设悬挑梁。 在建筑物四角转弯处,悬挑梁可按附图所示方案布设,并相互连牢。 根据悬挑梁布设方案要求进行放线、定位。 杆件搭设顺序如下:放置悬挑梁-立柱-横向扫地杆-第一步横向水平杆-练墙件-第二步横向水平杆。11. 脚手架搭设注意事项:悬挑梁应准确地放在定位线上,焊在梁上防止立杆滑动的短钢筋,在纵向应成一条线。搭设立柱时,外径不同的钢管严禁混用,相临立柱的对接扣件不得在同一高度内,错开距离应符合构造要求。开始搭设立柱时,要采用安全措施,保证其稳定与垂直。当搭至有连墙件的构造时,搭设完该处的立柱、纵向水平杆、横向水平杆后,应立即设置连墙件。封闭型脚手架的同一步纵
13、向水平杆必须四周交圈,用直角扣件与内、外脚柱固定。横向水平杆靠墙一端至墙装饰面的距离不应大于100mm。当脚手架操作层高出连墙件两步时,应采取临时稳定措施,直到连墙件搭设完后方可拆除。剪刀撑、横向支撑应随立柱、横向水平杆等同步搭设,剪刀撑、横向支撑等扣件的中心线距主节点的距离不应大于150mm 。对接扣件的开口应朝上或朝内。各杆件端头伸出扣件盖板边缘的长度不应小于100mm。铺设脚手板时,应满铺、铺稳,靠墙一侧立墙面距离不应大于150mm。12. 脚手架拆除要点: 划出工作区域,禁止行人进入,并有人监督指挥。 严格遵守拆除顺序,由上而下,后绑者先拆处,先绑者后拆除,一般先拆栏杆,脚手板,剪刀撑
14、,而后拆除小横杆、大横杆、立杆等。 统一指挥,上下呼应,动作协调,当解开与另一个人有关的结扣时,应先告知对方以防坠落。(英文版 ) Two regulations promulgated for implementation is in the party in power for a long time and the rule of law conditions, the implementation of comprehensive strictly strategic plan, implementation in accordance with the rules and disci
15、pline to manage the party, strengthen inner-party supervision of major initiatives. The two regulations supporting each other, the adhere to a positive advocate, focusing on morality is of Party members and Party leading cadres can see, enough to get a high standard; around the party discipline, dis
16、ciplinary ruler requirements, listed as negative list, focusing on vertical gauge, draw the party organizations and Party members do not touch the bottom line . Here, the main from four square face two party rules of interpretation: the first part introduces two party Revised regulations the necessi
17、ty and the revision process; the second part is the interpretation of the two fundamental principles of the revision of laws and regulations in the party; the third part introduces two party regulations modified the main changes and needs to grasp several key problems; the fourth part on how to gras
18、p the implementation of the two regulations of the party. and revised the necessity and revised history of the CPC Central Committee the amendment to the Chinese Communist Party members and leading cadres honest politics several guidelines and column 1 by 2015 to strengthen party laws and regulation
19、s focus. Two party regulations revision work lasted a Years, pooling the wisdom of the whole party, ideological consensus, draw historical experience, respect for the wisdom of our predecessors, which reflects the unity of inheritance and innovation; follow the correct direction, grasp the limited g
20、oals, adhere to the partys leadership, to solve the masses of the people reflect a focus on the problem. The new revision of the and , reflects the partys 18 and the eighth session of the third, the spirit of the fourth plenary session, reflecting the experience of studying and implementing the Gene
21、ral Secretary Xi Jinping series of important speech, reflects the partys eighteen years comprehensive strictly practice. (a) revised two regulations of the party need of in based on revised, the promulgation and implementation of January 2010, to strengthen the construction of the contingent of lead
22、ing cadres play an important role. But with the party to manage the party strictly administering the deepening, has not been able to fully meet the actual needs. Content is too complicated, eight prohibition, 52 are not allowed to hard to remember, and also difficult to put into practice; the second
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 25 高悬 扣件 钢管 脚手架 设计 施工 方案 01
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【可****】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【可****】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。