国际工程项目施工分包合同中英文.doc
《国际工程项目施工分包合同中英文.doc》由会员分享,可在线阅读,更多相关《国际工程项目施工分包合同中英文.doc(15页珍藏版)》请在咨信网上搜索。
1、精选资料国际工程项目施工分包合同(中英文)CONTRACT OF SUBPROJECT EXECUTION 本合同系中译英翻译:张云军Translated from Chinese to English by Mr. Chang Yunejune. 签署日期: Date of Signature :总包商:General Contractor 分包商:Subcontractor 电气机械承包公司(以下简称总包商),和工程施工公司(以下简称分包商),于订立本分包合同。鉴于总包商已同利比亚国大型电气项目管理局(以下简称业主),就电气机械承包工程项目的设计,运输和施工签订了合同;鉴于分包商愿按该合同
2、实施土建和安装工程而报了价;鉴于总包商已接受分包商的报价,并依据分包商所附的报价表,现双方达成协议如下:This contract is made and entered into on , between Electrical Machine Contracting Company (hereinafter referred to as general contractor) and Engineering Company (hereinafter referred to as subcontractor).WHEREAS general contractor has concluded c
3、ontract, with Libyan National Authority of Large Electrical Project (hereinafter referred to as employer ), of the design, transportation and execution of the contracted project of electrical machine installation;WHEREAS subcontractor is willing to execute the project of civil engineering and instal
4、lation and made quotation thereon;WHEREAS general contractor has accepted subcontractors quotation;NOW THEREFORE parties hereto, as per subcontractors quotation, hereby covenant and agree as follows:(一)下列文件应是本分包协议的组成部分:Following documents is the integral parts of this subcontracting contract.电气、机械及技
5、术操作的合同通用条款(1980年第一版);General Provisions on Electrical / Machine and Technical Operation ( First version 1980);合同的特殊条款; Particular Provisions of Contract;电气机械工程项目的技术规范;Technical Norms of Project of Electrical / Machine;工作范围和技术要求;Contents and Technical Requirements for Project;土建和安装工程分包合同的报价表。Quotatio
6、n for Subcontract of Civil Engineering and Installation.(二)工作范围 Project Contents本建设电气机械工程项目位于利比亚共和国境内,业主的技术规定如图所示。分包商的工作范围包括如下内容:The project of Electrical Machine which technical requirements as shown in drawings, is located in the territory of Republic of Libya. The Working contents of subcontracto
7、r include the following:提供所有工程的监督人员,熟练和非熟练工人,提供运输、测绘工具及设备,挖掘及钻孔机械,吊车,以承担塔架安装和导线挂垂和拉直等工作。Dispatching the personnel, for all projects, of supervision, skilled and unskilled workers, providing transportation, mapping tools / equipment, machines of digging & drilling and crane, which for the purpose of
8、the executions of tower installation, electrical lines hanging / straightening, and so on.提供混凝土材料、水泥、砂、石子、灰浆材料、钢筋,并运送到工地。Provision of and transportation of concrete materials, cement, sand, gravel, mortar materials and steel bar.为所有工人及管理人员提供住宿、膳食、供水、卫生设备、交通费用和社会保险。Provision of, for all workers and a
9、dministrators, accommodation, meals, water, sanitation, transport costs and social insurance.运送由总包商提供的库房中的塔架、导线、绝缘材料、五金构件、接地材料,包括从总包商库房到施工现场的运输,并负责卸车和保管。Transportation, from warehouse, provided by general contractor, of tower, electrical line, hardware components, grounding materials, which includin
10、g the responsibilities of transportation from general contractors warehouse to Work site in addition to unloading and storage thereof.分包商应按总包商提供的纵断面图和测绘图确定塔架的位置。凡是已由总包商定出的塔架位置,分包商应测量检验,以保证塔架的位置和线位方向符合合同技术规范的要求,并在取得总包商批准后,应对测绘图作相应的更改或修正。Subcontractor should, as per the profile view and mapping diagra
11、m, provided by general contractor, determine the location of tower on which, general contractor has terminated, subcontractor should make measure and inspection so as to ensure towers location and orientation conform the technical requirements hereof, and should, be subject to approval of general co
12、ntractor, process corresponding alteration or amendment thereof.(三)符合技术规范要求 Conformity With Requirements of Technical Norms分包商应熟悉技术规范,应按照业主的要求和合同规定,承担属于分包工程范围内的与分包商有关的全部责任。Subcontractor should, be familiar with the technical norms and as per employers requirements and contracts stipulation, assume a
13、ll responsibilities which within subcontracts works and relevant to subcontractor.(四)劳工 Labor分包商应:Subcontractor should提供足够数量的工人,以满足总包商工程师在工程进度方面的要求。Send a sufficient of number of workers to meet the necessity of project progress schedule by engineer of general contractor.支付雇员工资并自费为其雇员提供保险,为其雇员提供住宿及膳
14、食。Make payment, at its own expenses, of wages / salary and insurance for its employers, and provide employers with accommodation and meals.(五)遵守法律 Comply with Laws分包商应对下列事项承担法律责任:Subcontractor should assume legal liability for following items遵守利比亚国关于所得税的规定。如果其雇员中有人对雇主给他们的报酬不付个人所得税,分包商也应对此负责。Comply w
15、ith the provisions of income tax in Libya laws, if any employer fail to pay such tax against the payment of remuneration which paid by employer, subcontractor shall bear responsibility therewith.分包商应服从所有适用于本分包工程范围内的利比亚国的法律、地方法及规定。Subcontractor should obey all laws, local regulations and rules, which
16、 apply to this sub-project, of Libya.(六)与业主的关系 Relationship with Employer除总包商的工程师授权外,分包商任何时候均不能与业主接触或谈判。Subcontractor should not, at any time, take contact to and negotiation with employer except with the authorization of general contractors engineer.(七)维修保证期 Warranty Period分包商将从颁发验收证书之日起个月内所分包施工的工程
17、的质量保修责任。Subcontractor shall, within 12 months on and from the date of Acceptance certificate issued, take the liability of quality warranty for its subcontracting project.(八)保险 Insurance工程保险:总包商应按合同一般条款的规定,自费对永久和临时性工程、施工机械及设备进行保险,这应包括分包工程在内。Project Insurance: General contractor should, as per the st
18、ipulations of general provisions hereof, at its own expense, effect the insurance, which include sub-contract, covering the permanent and temporary works, construction machinery / equipment. 第三方保险:包括分包商在内的第三方保险,将由总包商承担,而分包商不付任何费用。分包商应自费负责其工人的保险,包括与分包工程有关的各种性质的索赔。Insurance for the third party: The th
19、ird party insurance which include subcontractor shall be effected by general contractor, for which no expense on subcontractor. Provided that subcontractor should at its own expense effect the insurance for its workers, include the claims of various kinds which relevant to subcontracted project.(九)工
20、具及设备 Tool and Equipment该分包工程施工和维修所需的全部工具,包括拉力设备、拨具、张紧装置、操作线、传动滑车等、分包商应自费提供。分包商应遵守利比亚国有关各种工具、设备、机械及运输工具方面的所有法律和海关规定,并支付由此产生的全部费用。一俟该分包工程竣工,分包商就应负责把上述全部设备和工具撤出利比亚国。Subcontractor should, at its own expense, provide any and all tools which necessary for execution and maintenance of project including pul
21、ling device, dial tool, tensioning device, operating line, driving pulley, and other tools.Subcontractor should comply with all laws and customs regulations in Libya on a variety of tools, equipments, machinery and transport vehicle and pay all expense which arising thererom. Subcontractor should, u
22、pon the completion of subcontracted works, withdraw all equipments and tools referred above out of Libyan country.(十)总包商材料的交付 Delivery of General Contractors Materials总包商应负责交付工程施工所需材料,包括塔架、塔架附件、导线、绝缘装置、绝缘体及导线配件、接地棒及接地线等。分包商应在总包商的仓库提取材料,将材料 装车,运送到施工现场并卸车,费用自行承担。按工程进度计划,对分包商各项工作所需要的材料,总包商至少要在该项工作开始前一周
23、为分包商备妥。如果总包商 未能按上述要求把材料交付给分包商,总包商应准许分包商相应的延长期。General contractor should be responsible for the delivery of construction materials needed for execution, which include tower and its accessories, electrical line, insulating device, insulators, wire accessories, grounding rods and grounding lines, and s
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 国际 工程项目 施工 分包 合同 中英文
1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前自行私信或留言给上传者【可****】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时私信或留言给本站上传会员【可****】,需本站解决可联系【 微信客服】、【 QQ客服】,若有其他问题请点击或扫码反馈【 服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【 版权申诉】”(推荐),意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:4008-655-100;投诉/维权电话:4009-655-100。