IEC 61400-4:2012 风力涡轮机 第4部分:风力发电机齿轮箱的设计要求.pdf
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- IEC 61400-4:2012 风力涡轮机 第4部分:风力发电机齿轮箱的设计要求 61400 2012 风力 涡轮机 部分 风力发电机 齿轮箱 设计 要求
- 资源描述:
-
IEC 61400-4 Edition 1.0 2012-12 INTERNATIONAL STANDARD Wind turbines Part 4:Design requirements for wind turbine gearboxes IEC 61400-4:2012(E)colourinside THIS PUBLICATION IS COPYRIGHT PROTECTED Copyright 2012 IEC,Geneva,Switzerland All rights reserved.Unless otherwise specified,no part of this publication may be reproduced or utilized in any form or by any means,electronic or mechanical,including photocopying and microfilm,without permission in writing from either IEC or IECs member National Committee in the country of the requester.If you have any questions about IEC copyright or have an enquiry about obtaining additional rights to this publication,please contact the address below or your local IEC member National Committee for further information.IEC Central Office Tel.:+41 22 919 02 11 3,rue de Varemb Fax:+41 22 919 03 00 CH-1211 Geneva 20 infoiec.ch Switzerland www.iec.ch About the IEC The International Electrotechnical Commission(IEC)is the leading global organization that prepares and publishes International Standards for all electrical,electronic and related technologies.About IEC publications The technical content of IEC publications is kept under constant review by the IEC.Please make sure that you have the latest edition,a corrigenda or an amendment might have been published.Useful links:IEC publications search-www.iec.ch/searchpub The advanced search enables you to find IEC publications by a variety of criteria(reference number,text,technical committee,).It also gives information on projects,replaced and withdrawn publications.IEC Just Published-webstore.iec.ch/justpublished Stay up to date on all new IEC publications.Just Published details all new publications released.Available on-line and also once a month by email.Electropedia-www.electropedia.org The worlds leading online dictionary of electronic and electrical terms containing more than 30 000 terms and definitions in English and French,with equivalent terms in additional languages.Also known as the International Electrotechnical Vocabulary(IEV)on-line.Customer Service Centre-webstore.iec.ch/csc If you wish to give us your feedback on this publication or need further assistance,please contact the Customer Service Centre:csciec.ch.IEC 61400-4 Edition 1.0 2012-12 INTERNATIONAL STANDARD Wind turbines Part 4:Design requirements for wind turbine gearboxes INTERNATIONAL ELECTROTECHNICAL COMMISSION XG ICS 27.180 PRICE CODE ISBN 978-2-83220-506-8 Warning!Make sure that you obtained this publication from an authorized distributor.colourinside 2 61400-4 IEC:2012(E)CONTENTS FOREWORD.7 INTRODUCTION.9 1 Scope.10 2 Normative references.10 3 Terms,definitions and conventions.12 3.1 Terms and definitions.12 3.2 Conventions.15 4 Symbols,abbreviations and units.17 4.1 Symbols and units.17 4.2 Abbreviations.21 5 Design for reliability.23 5.1 Design lifetime and reliability.23 5.2 Design process.24 5.3 Documentation.26 5.4 Quality plan.26 6 Drivetrain operating conditions and loads.27 6.1 Drivetrain description.27 6.1.1 General.27 6.1.2 Interface definition.27 6.1.3 Specified requirements across interfaces.28 6.2 Deriving drivetrain loads.28 6.2.1 Wind turbine load simulation model.28 6.2.2 Wind turbine load calculations.29 6.2.3 Reliability of load assumptions.29 6.3 Results from wind turbine load calculations.29 6.3.1 General.29 6.3.2 Time series.30 6.3.3 Fatigue load.30 6.3.4 Extreme loads.31 6.4 Operating conditions.31 6.4.1 General.31 6.4.2 Environmental conditions.31 6.4.3 Operating strategies.32 6.5 Drivetrain analysis.32 7 Gearbox design,rating,and manufacturing requirements.32 7.1 Gearbox cooling.32 7.2 Gears.33 7.2.1 Gear reliability considerations.33 7.2.2 Gear rating.33 7.2.3 Load factors.34 7.2.4 Gear materials.36 7.2.5 Subsurface initiated fatigue.37 7.2.6 Gear accuracy.37 7.2.7 Gear manufacturing.37 7.3 Bearings.38 7.3.1 General.38 61400-4 IEC:2012(E)3 7.3.2 Bearing reliability considerations.38 7.3.3 Bearing steel quality requirements.39 7.3.4 General design considerations.39 7.3.5 Bearing interface requirements.42 7.3.6 Bearing design issues.43 7.3.7 Bearing lubrication.46 7.3.8 Rating calculations.47 7.4 Shafts,keys,housing joints,splines and fasteners.50 7.4.1 Shafts.50 7.4.2 Shaft-hub connections.50 7.4.3 Flexible splines.51 7.4.4 Shaft seals.51 7.4.5 Fasteners.51 7.4.6 Circlips(snap rings).52 7.5 Structural elements.52 7.5.1 Introduction.52 7.5.2 Reliability considerations.53 7.5.3 Deflection analysis.53 7.5.4 Strength verification.53 7.5.5 Static strength assessment.54 7.5.6 Fatigue strength assessment.58 7.5.7 Material tests.62 7.5.8 Documentation.63 7.6 Lubrication.63 7.6.1 General considerations.63 7.6.2 Type of lubricant.64 7.6.3 Lubricant characteristics.65 7.6.4 Method of lubrication.66 7.6.5 Oil quantity.67 7.6.6 Operating temperatures.68 7.6.7 Temperature control.68 7.6.8 Lubricant condition monitoring.69 7.6.9 Lubricant cleanliness.69 7.6.10 Lubricant filter.70 7.6.11 Ports.71 7.6.12 Oil level indicator.71 7.6.13 Magnetic plugs.71 7.6.14 Breather.72 7.6.15 Flow sensor.72 7.6.16 Serviceability.72 8 Design verification.72 8.1 General.72 8.2 Test planning.72 8.2.1 Identifying test criteria.72 8.2.2 New designs or substantive changes.73 8.2.3 Overall test plan.73 8.2.4 Specific test plans.73 8.3 Workshop prototype testing.74 8.3.1 General.74 4 61400-4 IEC:2012(E)8.3.2 Component testing.74 8.3.3 Workshop testing of a prototype gearbox.74 8.3.4 Lubrication system testing.75 8.4 Field test.75 8.4.1 General.75 8.4.2 Validation of loads.75 8.4.3 Type test of gearbox in wind turbine.76 8.5 Production testing.77 8.5.1 Acceptance testing.77 8.5.2 Sound emission testing.77 8.5.3 Vibration testing.77 8.5.4 Lubrication system considerations.77 8.5.5 System temperatures.77 8.6 Robustness test.77 8.7 Field lubricant temperature and cleanliness.77 8.8 Bearing specific validation.78 8.8.1 Design reviews.78 8.8.2 Prototype verification/validation.78 8.9 Test documentation.79 9 Operation,service and maintenance requirements.79 9.1 Service and maintenance requirements.79 9.2 Inspection requirements.79 9.3 Commissioning and run-in.79 9.4 Transport,handling and storage.80 9.5 Repair.80 9.6 Installation and exchange.80 9.7 Condition monitoring.80 9.8 Lubrication.80 9.8.1 Oil type requirements.80 9.8.2 Lubrication system.80 9.8.3 Oil test and analysis.81 9.9 Operations and maintenance documentation.81 Annex A(informative)Examples of drivetrain interfaces and loads specifications.82 Annex B(informative)Gearbox design and manufacturing considerations.93 Annex C(informative)Bearing design considerations.96 Annex D(informative)Considerations for gearbox structural elements.122 Annex E(informative)Recommendations for lubricant performance in wind turbine gearboxes.125 Annex F(informative)Design verification documentation.140 Annex G(informative)Bearing calculation documentation.143 Bibliography.151 Figure 1 Shaft designation in 3-stage parallel shaft gearboxes.15 Figure 2 Shaft designation in 3-stage gearboxes with one planet stage.16 Figure 3 Shaft designation in 3-stage gearboxes with two planet stages.17 Figure 4 Design process flow chart.25 Figure 5 Examples of bearing selection criteria.39 61400-4 IEC:2012(E)5 Figure 6 Blind bearing assembly.45 Figure 7 Definition of section factor npl,of a notched component.56 Figure 8 Idealized elastic plastic stress-strain curve.57 Figure 9 Synthetic S/N curve(adapted from Haibach,2006).60 Figure A.1 Modular drivetrain.82 Figure A.2 Modular drivetrain with 3-point suspension.83 Figure A.3 Integrated drivetrain.83 Figure A.4 Reference system for modular drivetrain.85 Figure A.5 Rear view of drivetrain.86 Figure A.6 Reference system for modular drivetrain with 3-point suspension.87 Figure A.7 Reference system for integrated drivetrain.88 Figure A.8 Example of rainflow counting per DLC.90 Figure A.9 Example of load revolution distribution(LRD).91 Figure C.1 Load bin reduction by lumping neighbouring load bins.97 Figure C.2 Consumed life index(CLI).99 Figure C.3 Time share distribution.99 Figure C.4 Effects of clearance and preload on pressure distribution in radial roller bearings(from Brandlein et al,1999).102 Figure C.5 Nomenclature for bearing curvature.103 Figure C.6 Stress distribution over the elliptical contact area.105 Figure C.7 Examples of locating and non-locating bearing arrangements.114 Figure C.8 Examples of locating bearing arrangements.114 Figure C.9 Examples of accommodation of axial displacements.114 Figure C.10 Examples of cross-locating bearing arrangements.115 Figure C.11 Examples of bearing arrangements with paired mounting.115 Figure D.1 Locations of failure for local(A)and global(B)failure.123 Figure D.2 Local and global failure for two different notch radii.123 Figure D.3 Haigh-diagram for evaluation of mean stress influence(Haibach,2006).124 Figure E.1 Viscosity requirements versus pitch line velocity.126 Figure E.2 Test apparatus for filterability evaluation.134 Figure E.3 Example for circuit design of combined filtration and cooling system.138 Table 1 Symbols used in the document.18 Table 2 Abbreviations.21 Table 3 Mesh load factor K for planetary stages.35 Table 4 Required gear accuracy.37 Table 5 Temperature gradients for calculation of operating clearance.44 Table 6 Bearing lubricant temperature for calculation of viscosity ratio,.46 Table 7 Guide values for maximum contact stress at Miners sum dynamic equivalent bearing load.49 Table 8 Minimum safety factors for the different methods.50 Table 9 Partial safety factors for materials.55 Table 10 Partial safety factors m for synthetic S/N-curves of cast iron materials.61 Table 11 Recommended cleanliness levels.70 6 61400-4 IEC:2012(E)Table A.1 Drivetrain elements and local coordinate systems.84 Table A.2 Drivetrain element interface dimensions.85 Table A.3 Interface requirements for modular drivetrain.86 Table A.4 Interface requirements for modular drivetrain with 3-point suspension.87 Table A.5 Interface requirements for integrated drivetrain.88 Table A.6 Engineering data and required design load descriptions.89 Table A.7 Rainflow matrix example.89 Table A.8 Example of load duration distribution(LDD).91 Table A.9 Extreme load matrix example.92 Table B.1 Recommended gear tooth surface roughness.94 Table C.1 Guide values for basic rating life Lh10 for preliminary bearing selection.96 Table C.2 Static load factors for radial bearings.101 Table C.3 Bearing types for combined loads with axial loads in double directions.110 Table C.4 Bearing types for combined loads with axial loads in single direction.111 Table C.5 Bearing types for pure radial load.112 Table C.6 Bearing types for axial load.113 Table C.7 Bearing selection:Legend.116 Table C.8 Bearing selection:Low speed shaft(LSS)/planet carrier.117 Table C.9 Bearing selection:Low speed intermediate shaft(LSIS).118 Table C.10 Bearing selection:High speed intermediate shaft(HSIS).119 Table C.11 Bearing selection:High speed shaft(HSS).120 Table C.12 Bearing selection:Planet bearing.121 Table D.1 Typical material properties.122 Table E.1 Viscosity grade at operating temperature for oils with VI=90.127 Table E.2 Viscosity grade at operating temperature for oils with VI=120.128 Table E.3 Viscosity grade at operating temperature for oils with VI=160.129 Table E.4 Viscosity grade at operating temperature for oils with VI=240.130 Table E.5 Standardized test methods for evaluating WT lubricants(fresh oil).132 Table E.6 Non-standardized test methods for lubricant performance(fresh oil).133 Table E.7 Guidelines for lubricant parameter limits.136 Table F.1 Design validation and verification documentation.140 61400-4 IEC:2012(E)7 INTERNATIONAL ELECTROTECHNICAL COMMISSION _ WIND TURBINES Part 4:Design requirements for wind turbine gearboxes FOREWORD 1)The International Electrotechnical Commission(IEC)is a worldwide organization for standardization comprising all national electrotechnical committees(IEC National Committees).The object of IEC is to promote international co-operation on all questions concerning standardization in the electrical and electronic fields.To this end and in addition to other activities,IEC publishes International Standards,Technical Specifications,Technical Reports,Publicly Available Specifications(PAS)and Guides(hereafter referred to as“IEC Publication(s)”).Their preparation is entrusted to technical committees;any IEC National Committee interested in the subject dealt with may participate in this preparatory work.International,governmental and non-governmental organizations liaising with the IEC also participate in this preparation.IEC collaborates closely with the International Organization for Standardization(ISO)in accordance with conditions determined by agreement between the two organizations.2)The formal decisions or agreements of IEC on technical matters express,as nearly as possible,an international consensus of opinion on the relevant subjects since each technical committee has representation from all interested IEC National Committees.3)IEC Publications have the form of recommendations for international use and are accepted by IEC National Committees in that sense.While all reasonable efforts are made to ensure that the technical content of IEC Publications is accurate,IEC cannot be held responsible for the way in which they are used or for any misinterpretation by any end user.4)In order to promote international uniformity,IEC National Committees undertake to apply IEC Publications transparently to the maximum extent possible in their national and regional publications.Any divergence between any IEC Publication and the corresponding national or regional publication shall be clearly indicated in the latter.5)IEC itself does not provide any attestation of conformity.Independent certification bodies provide conformity assessment services and,in some areas,access to IEC marks of conformity.IEC is not responsible for any services carried out by independent certification bodies.6)All users should ensure that they have the latest edition of this publication.7)No liability shall attach to IEC or its directors,employees,servants or agents including individual experts and members of its technical committees and IEC National Committees for any personal injury,property damage or other damage of any nature whatsoever,whether direct or indirect,or for costs(including legal fees)and expenses arising out of the publication,use of,or reliance upon,this IEC Publication or any other IEC Publications.8)Attention is drawn to the Normative references cited in this publication.Use of the referenced publications is indispensable for the correct application of this publication.9)Attention is drawn to the possibility that some of the elements of this IEC Publication may be the subject of patent rights.IEC shall not be held responsible for identifying any or all such patent rights.International Standard IEC 61400-4 has been prepared by IEC technical committee 88:Wind turbines,in co-operation with ISO t展开阅读全文
咨信网温馨提示:1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前可先查看【教您几个在下载文档中可以更好的避免被坑】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时联系平台进行协调解决,联系【微信客服】、【QQ客服】,若有其他问题请点击或扫码反馈【服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【版权申诉】”,意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:0574-28810668;投诉电话:18658249818。




IEC 61400-4:2012 风力涡轮机 第4部分:风力发电机齿轮箱的设计要求.pdf



实名认证













自信AI助手
















微信客服
客服QQ
发送邮件
意见反馈



链接地址:https://www.zixin.com.cn/doc/3734514.html