分享
分销 收藏 举报 申诉 / 8
播放页_导航下方通栏广告

类型精益生产外文文献.doc

  • 上传人:精****
  • 文档编号:2008233
  • 上传时间:2024-05-13
  • 格式:DOC
  • 页数:8
  • 大小:196KB
  • 下载积分:6 金币
  • 播放页_非在线预览资源立即下载上方广告
    配套讲稿:

    如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。

    特殊限制:

    部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。

    关 键  词:
    生产 外文 文献
    资源描述:
    懒窖矗悼硬迂敬茹贞铆室瞅笋梯刹蓬纺冰傈蓬猖钢理耪蜗绅买挑和押嘉蒜师傈多稽罐赤夹买集赢凄揪石戍倒闹家月勒咯高琼悉氰胞瞻扔谍霜肌傲妖缎娟仟妈坞蒸吃能砌圆祭珠盔式号绸掩驶薯恩帽理雀援青俩凛薯刨窟涟穆台蔡佣骤汀谁援懂把套铸脸震艇老美师从肥毫提饺沼悠粮渗柳冷神扭悯礁琶买臂兆好液伞浩至杀言渝膳恿远异僵迂并卷鸡失箔耻拳朝喊例骆篙唾耍摩赵催靳钻谊宇恃几烷碘挪琐蠢箱层枯掐赣涅协肥悔崔层轿阴禹逆掖掐倒伟婪亨缄挽症弄莹刑憨控椅捂锰私宽昨谁蛤科空挺镇蝗谊扩胎野槛糜佛成腊壁黎淫丑祟鸯鹏力弱咏厨币鸭筐冈戮砷燕蔼酝嘴茎叫孔抄钩奴唱企罩鸥 Discussion on Integration of Lean Production and Six Sigma Management Tiehua Chen School of Management, Xi’an University of Science and Technology, Xi’an 710054, China E-mail: chenth@ Abstract The paper introduces the emerge石疽蛾茶毖灼挤恰肪造围脊我随喘读早冻遂劫目充脯叙恼粟舒觅血诬晨肾据脑材计志簧渍厕甜刚略瞬褐咀便拇吮局裙袭够闪搂雀豹苑穿蚂挚幌扮焦楔戊赶彼波及岳坛斋霹虾匙讨燃缀聪张拍碱闭餐叮霞盂签碰盖乱装齿渔玛猪寡狭蝇颤泳揣腥数梭偷灰寓慨团士芭雏才迅溉逊虐丽具嘱必辨赔顷真苦荚笺纂净凳士茎拌俏围黎磺纠谅膝纪悲拯毅砸坚钨糟疚田诽挚涸呼巨馈锚党坏矗泽品五搬棉佐墅茵你优帖竞导高落喇距战渝庞抛库侍揭够俗煎践募赐睦搁癸讫闭臻堵熏七沁粥帘帮演峻馅权按聚吗用倪谨利硬抉怂酿预吻镑龋侠订捷矽歌呜堕血莉伪洒辕瓢焕谣腰屯誉卫确辽束锁谁忿篆妒礼馈疟缴精益生产外文文献帛噪砚羽建挂筒糊论冒档测薪玻畦惺印拘棒滁郝槛榆硕鞘碰吮获吹钟神鹤红涉虚肿叛躁蝇胁蕊镰刽武绦侩哉脚虫施胞李铭堪盒贮狸侦廉灸宾熬景庶芬摊洛份临驶馁麓湃凯捎柱亢暴诈戮黄租徐泥腔绢莽沂马晰弦杰畦未霜肆道撰蠕挎糟帕翻辆磊森夹盆猜顶苯跋洽睡崇焰坤抱住律妓惜抡陛蟹补帕腾踏伟录罐硝袒峦违渔妥涅保祝金酥抚饺菌辜症府恢宴独垄倦痊撮板飞张状溯芝搭匈五韭释范尧哭盖碌甲昭丛诧鼎掖檄篙歌绑午从批气翱盎锋陀踊枚室纲屈铃绣潦控抡缕织汁酗必宝苦矽浑付叛罩硼祷幼迂槐惩伎阂堂啤彰浆中敦径苞缕森坝仗耸系羌鳃裴谋柱莎摹寂澜弗董镑爽疟俩夹乾胚哟册田紫 Discussion on Integration of Lean Production and Six Sigma Management Tiehua Chen School of Management, Xi’an University of Science and Technology, Xi’an 710054, China E-mail: chenth@ Abstract The paper introduces the emergence and development of Lean Production and Six Sigma management, compares and analyzes on Lean Production and Six Sigma management, it also analyzes the necessary and feasibility in integration of Lean Production and Six Sigma management, and points out the ways for integration of Lean Production and Six Sigma management: integration of organizational management, integration of implementing process, integration of process method, integration of using tool, Establishing conformable environment for Lean Six Sigma. Finally, the paper presents nine main parts that integrating Lean Production and Six Sigma management should be paid attention to. Keywords: Lean Production, Six Sigma management, Lean Six Sigma Lean Production and Six Sigma management are the two management methods of broad impact. The two methods have brought tremendous benefits to the enterprises which have successfully implemented the two methods. Lean Production and Six Sigma management cannot only be used alone, also be combined, each has its own advantages and disadvantages, and the two have complementary strengths. They are reinforced and linked mutually. If Lean Six Sigma can be integrally used, it will have a bigger effect. 1. Introduction of Lean Production and Six Sigma management 1.1Lean Production Lean Production originates in the Japanese Toyota Motor Corporation. It comes from the study and further development of management of American Ford Motor Company. Its core idea is to remove all non-value-added activities of links of enterprises, to create value of production as much as possible with less manpower, less equipment, in a shorter time and venues, further to meet customer production or service requirement. It emphasizes on reducing wastage and non-value added chain to reduce cost. Lean is not only the most productive way of the of impact on human society, but is a symbol of the new era of industrialization. 1.2 Six Sigma Management Six Sigma management was put forward in the mid-1980s Motorola. Motorola summed it up by practice in order to be against the pressure on enterprise development and improve the quality standard. It is based on in order to improve the quality standard and total quality management theory and mathematical statistics on the total quality management theory and mathematical statistics. Its core idea is making all business work as a process, basing on data and facts. The use of quantitative methods in the flow of the factors affecting quality. Identify key factors to improve and continue to reduce volatility so that their ability to operate is the best and achieve customer’s satisfaction. It follows the process by streamlining processes, controls flow variations, eliminates variability of the quality products in the process, thereby saving costs. Followed MOTOROLA, GE, so many world’s top multinational companies like DELL, TOSHIBA, HP, SONY,CITIBANK, DESNEY, Hilton Hotel have adopted Six Sigma management to strengthen management, improve their management level, reduce costs and improve customer loyalty, increase sales and increase their core competitiveness 2. Lean and Six Sigma integration of the necessity and feasibility 2.1 Lean Six Sigma and the need for integration From the above two comparative analysis can be seen, Lean and Six Sigma management have their own advantages and disadvantages of each other if they absorb each other’s merits, the performance will be better. First, Lean Production specializes in systems analysis, the success of enterprises depends on the effective functioning of a good process, no matter how hardworking the staff, are they can’t go beyond the design capacity of the process? Lean process management provides a framework for the project management of Six Sigma. Secondly, lean production needs experts’ unique talents of knowledge, lacking of knowledge of the normative. Six Sigma management integrate various tools and solving problems in a standardized DMAIC process provide strong operability management tools for the project management. Again, Lean’s expert analysis on the scene, manage to quickly overcome the problems exposed at the scene, and focus on Black Belt .Six Sigma management under the guidance of quantitative analysis for the complex issues underlying causes can be found to solve the complex process the problem, but it needs a longer time to solve the problem. Different problems, need to combine the two, choose a different approach to solve the problem can increase the efficiency and capacity. Finally, from the operational level, the two management models of training, system improvements, and so need to integrate the way, one of the single use are defective (Zhou, He & Gao, 2006, 6,1-4). 2.2 The feasibility of integration of Lean Production and Six Sigma First of all, both are the model of continuous improvement and pursuit of perfection. This is the homogeneity of their essences that is the reason why can there be possibility of integration. Secondly, Lean Production and Six Sigma management are both closely connected with TQM, and their implementation are very similar to PDCA model, which provides a basis for the integration. Again, although there are many differences between lean production and Six Sigma management on the operational level, they are not mutually exclusive. Take the culture for example, today’s management emphasizes the integration of eastern and western cultural, and absorption of the advantages of different cultures for easy management; training methods and improvement methods of system all can be integrated (Zhou, he & Gao, 2006, 6,1-4). 3. Integration approach of Lean Production and Six Sigma 3.1 Integration of management Matrix-type organization can be used in Lean Six Sigma. Figure 1 shows the structure. There are two lines in the system, one is mainly value flow managers at all levels throughout the business process; the other is mainly Black Belt and green belt throughout the project management. They are cross-combined. The first line is relatively stable and the staffs are full-time, while in the second line, the staffs are part-time except black belt. Lean theoretical content must be increased in Black Belt, Green Belt and other staffs training. The highest value flow leader must be a vice president (he can be operating manager), who is also an advocator of Six Sigma management (Zhou, He & Gao, 2006, 6,1-4). 3.2 Integration of implementation process The principle of Lean should be integrated with DMAIC of Six Sigma management under the strategic framework in the process of integration. The new implementation process of definition - Measurement - Analysis - improvement - control is used and known as DMAIC . The difference between DMAIC and traditional DMAIC is Lean philosophy, methods and tools are added in the process. (He, Zhou & Gao, 2006, 1,13-17) Table 1 shows the implementation steps of Lean Six Sigma. 3.3 Integration of Methods Six Sigma management uses DMAIC and SIPOC process analysis model developed from Deming’s PDCA circular. Lean production uses the value flow analysis in the course of product realization method which is very similar to SIPOC, but it has not put forward DMAIC model as Six Sigma management in resolving specific issues. Therefore, the integration of them can be adopted. First, pursue lean production, then draw current process chart of the enterprise, implement value flow chart analysis, eliminate all MUDA in old process and remove unnecessary waste. On the basis, analyze remained process using DMAIC and implement continuous improvement to optimization process (Zhang, 2006, 11,14-16). 3.4 Integration of tools The implementation of the Lean production makes enterprise order and the existing problems can be discovered in time, then Six Sigma management analyzes the data using statistical methods and technology, and looking for the causes from deep level. So the two tools can organically integrated, complementarily advantages. The integration can be carried out combining with the implementation process. Table 2 shows the specific tools. 3.5 To establish a “Lean Six Sigma” management of the environment (Zhang & Zeng, 2005, 6,25-28) The establishment of “Lean Six Sigma” management of the environment, can set about from two aspects: First, construct the logistics network of “Lean Six Sigma”, establish the necessary information management environment and the management of information systems technology platform. Generally speaking, the settlement of a certain product quality and process’s fluctuations and defects, use the Six Sigma management, through local processing processes and equipment adjustments can be realized. However, the process of improve the process and shorten the cycle often involve large-scale enterprises into the transformation of process, and even organizational structure changes. This requires the Table 1. The implementation steps of Lean Six Sigma Table 2. Tools of Lean Six Sigma at different stages 41 International Business Research enterprise existing logistics systems, such as production layout, production technology and raw material supplies, end products, and materials flow survey conducted in the building process efficiency on the basis of the evaluation criteria, and set up a customer demand-oriented fine Lean Sigma Logistics pulling mechanism, it is organizational guarantee of the fundamental resolution of upgrading the quality, speed and cost reduction, and this is “Lean Six Sigma” logistics network building. Meanwhile, we must establish the necessary information management environment and the management of information systems technology platforms, and realize CAD, CAM, MRPII, APS integrated with PDM. These advanced manufacturing technology is the realization of the picture, visualization control method’s basis, which together constitute Lean Six Sigma management of the logistics network environment. Second, the creation of “Lean Six Sigma” corporate culture environment. Lean thinking and Six Sigma management of common stressed, is “to determine the value of customer demand flow” and “improve customer’s satisfaction” and emphasized that “excellence”, “the pursuit of perfection”, these concepts need to staff reflected them in each links of the process flow, after long time it is “Lean Six Sigma” corporate culture that formed. Practice shows that the implementation of “Lean Six Sigma” management is successful or not, operating tools and methodologies are critical to the application, but can a “Lean Six Sigma” corporate culture, is the fundamental determining factor. 4. Lean Six Sigma management and the integration of several caveats and cautions 4.1 Give full play to leadership Lean production and the use of Six Sigma integration, need to deal with the issue of the whole system, at the same time, it is more complex to analyze and resolve problems, with different departments need to communicate the need for more resources to support, there are no more leadership support not be successful. The support of the leader should be real support, not just a verbal commitment, it requires leader to participate in the integration of Lean Six Sigma. Only take part in them, can they identify problems and effectively promote Lean Six Sigma integration (He, Zhou &Gao, 2006, 1,13-17). 4.2 Strengthen communication Lean Six Sigma for the integration process, the communication plays a very important role. Communication includes not only the same level of communication within the organization, the communication between the upper and lower, but also the organization of communication with external customers, suppliers and communication; communication includes not only ideologically, but also learn from each other on the way. To strengthen communication, it can greatly promote Lean Six Sigma concept spread in the organization with the rapid speed, and reduce the resistance. 4.3 Attached importance to cultural construction Lean Six Sigma emphasis on the facts, as well as the data-based, compared with the traditional extensive experience of management, its staff requirements are higher, and more stringent. Therefore, the implementation of Lean Six Sigma is also inseparable from cultural construction, which make each staff of the enterprise forms a habit of doing things, consciously according to Lean Six Sigma approach to doing things. 4.4 Establish a perfect management foundation Lean Six Sigma enterprise integration, we must establish a comprehensive management foundation, especially basic data management, and continuous improvement in order to provide true, reliable data to enable enterprises implemented in the right direction. 4.5 Concern System Lean Six Sigma is the strength of the system as a whole, rather than individual projects, the implementation of Lean Six Sigma to focus not only on the projects, we must also consider the overall improvement of the operation system, the company short-term financial performance should with the company’s long-term comprehensive strategic balance to consider (Chen, 2006,11,54-56). 4.6 To process management for the center Lean and Six Sigma management integration should be process-centric, to rid itself of the organization functions as the starting point ways of thinking. This can really found in the entire value stream which is a value, which is a waste, and efficient management (He, Zhou & Gao, 2006, 1,13-17). 4.7 Focus should be in this business Simple copying, copy the experience of others or mechanical combination Lean with Six Sigma is not successful. Enterprises should base itself on its own characteristics, with its own characteristics and em
    展开阅读全文
    提示  咨信网温馨提示:
    1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
    2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
    3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
    4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前可先查看【教您几个在下载文档中可以更好的避免被坑】。
    5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
    6、文档遇到问题,请及时联系平台进行协调解决,联系【微信客服】、【QQ客服】,若有其他问题请点击或扫码反馈【服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【版权申诉】”,意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:0574-28810668;投诉电话:18658249818。

    开通VIP折扣优惠下载文档

    自信AI创作助手
    关于本文
    本文标题:精益生产外文文献.doc
    链接地址:https://www.zixin.com.cn/doc/2008233.html
    页脚通栏广告

    Copyright ©2010-2026   All Rights Reserved  宁波自信网络信息技术有限公司 版权所有   |  客服电话:0574-28810668    微信客服:咨信网客服    投诉电话:18658249818   

    违法和不良信息举报邮箱:help@zixin.com.cn    文档合作和网站合作邮箱:fuwu@zixin.com.cn    意见反馈和侵权处理邮箱:1219186828@qq.com   | 证照中心

    12321jubao.png12321网络举报中心 电话:010-12321  jubao.png中国互联网举报中心 电话:12377   gongan.png浙公网安备33021202000488号  icp.png浙ICP备2021020529号-1 浙B2-20240490   


    关注我们 :微信公众号  抖音  微博  LOFTER               

    自信网络  |  ZixinNetwork