分享
分销 收藏 举报 申诉 / 8

类型财政预算报告.doc

  • 上传人:精***
  • 文档编号:9662271
  • 上传时间:2025-04-02
  • 格式:DOC
  • 页数:8
  • 大小:67.54KB
  • 下载积分:6 金币
  • 配套讲稿:

    如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。

    特殊限制:

    部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。

    关 键  词:
    财政预算 报告
    资源描述:
    Introduction Tricol plc a company who makes a range of furniture and kitchenware. And one of its most popular products is the ‘Zupper’ expandable table. The purpose of writing this report is to do the variance analysis, project evaluation and to compare the budget and actual data by using the technique. Findings Part A Possible Reason for Variances 1. Material Direct Material – Total - £2,400 F made up: Direct Material Usage –£8,000 F (Level of significance –usage/total budgeted Material costs = 8,000/64,000 = 12.5% > 3%, should be reviewed) 800 kg less materials are used than budgeted for the actual level of production. Possible reason may be using the higher-grade material with less wastage. Or the new machinery use less materials and incurs less wstage. Direct Material Price –£5,600 A (5,600/64,000=8.75% >3%) It is £1 per kg more expensive than planned Possible reason: New material supplier does not give discounts for materials. Hither-grade materials have been used which is more expensive. 2. Labour Direct Labour Total - £6,400A Direct Labour Rate –£3,520A (3,520/28,800=12.2%>3%) On average, the actual labour rate is £1/hour higher than budgeted Possible reason: The wage settlement is higher than expected The new machine requires trainings so that overtime required more than expected. Direct labour Efficiency - £2,880 A (2,880/28,800=10%>3%) Actually, more than 320 labour hours have been used than budgeted. Possible reason: New machinery requires more hours for training.. Human resource issues – the skilled operatives is not enough. 3.Total Overhead - £400 F (400/3,200=12.5%>3%) Unpredicted increase in insurance and Administration costs Possible reason: New machinery brings more expensive insurance, higher maintenance and additional administrative costs. Part B 1. Key assumptions made: a) There is no taxation and inflation. b) Assumed that there is no vary given return market rate. c) The total cost of the project will be payable at the start d) The expected revenue from the investment – this is the expected Net Cash Flow after deduction of all relevant costs 2. Payback Payback in this case is 4.125 years (total investment-return period is five years). So the company can get back the investment. The Net Present Value is £- 64,800. It indicates that the project does not appear to be financially viable. Conclusion Part B This project is available because the payback is 4.125years. But the Net Present Value (NPV) is negative. So the project is not available. However, we should use the conclusion of the Net Present Value because the Net Present Value (NPV) considered the time value of money. Recommendations Part A Recommendations for management action: 1. All the variances should be analysis because all of them are above 3%, the level of significance. 2. Particularly, the direct labour variances need further investigation – why is the company paying a higher wage rate but the labour productivity is lower than planned. Part B 1. To consider the effect of the new facilities on company’s own staff – in terms of employment and redeployment opportunities. 2. To consider any changes in any other areas, like social, political, economic, legal and technological factors. 3. Whether it is possible for the company to raise the sufficient funds – to consider if the current cash flow position can support such an investment. Appendix Part A 1.Table 1 Tricol plc Flexed Budget for June Tricol plc Flexed Budget For June Fixed Budget 2,000 units Flexed Budget 1,600 units Actual 1,600 units Variance £ £ £ £ A/F Direct Material 10*4*2,000= 80,000 10*4*1,600= 64,000 61,600 2,400 F Direct Labor 2*9*2,000= 36,000 2*9*1,600= 28,800 35,200 6,400 A Variable Production Overheads 2*2,000= 4,000 2*1,600= 3,200 3,200 0 Insurance costs 2,200 2,200 2,400 200 A Depreciation 1,500 1,500 1,500 0 Rent and Rates 2,500 2,500 2,500 0 Administration Overheads 2,000 2,000 2,200 200 A Fixed Overheads 8,200 8,200 8,600 400 A Total 128,200 104,200 108,600 4,400 A 2. Further Variance Analysis The calculation of the variances a) Direct material total : (Budgeted Quantity*Budgeted Price) – (Actual Quantity*Actual Price) =(4kg*1,600*£10per kg) - (5,600kg*£11 per kg)=£64,000-£61,600=£2,400 F b) Direct material usage : Budgeted price* (Budgeted Quantity – Actual Quantity) =£10per kg * (4kg * 1,600-5,600kg)= £8,000 F c) Direct material price : Actual Quantity* (Budgeted price – Actual price)=5,600kg*(£10 per kg -£11 per kg) =£5,600A d) Direct labor total : Budgeted Hours*Budgeted Rate – Actual hours*Actual Rate =(2hours*1600*£9)- £35200=£6,400A e) Direct labor rate : Actual Hours*(Budgeted Rate – Actual Rate) =3,520hours*(£9-£10)= £3,520A f) Direct labor efficiency : Budgeted Rate*(Budgeted Hours – Actual Hours) =£9-(2hours*1600-3520hours)= £2,880A g) Total overhead : (Budget Variable Overhead + Budget Fixed Overhead) - (Actual Variable Overhead + Actual Fixed Overhead) = (£4000 + £8200) - (£3200 + £8600) = £400 F Part B 1. Payback period method Year Yearly net cash flow £ Cumulative cash flow £ 0 (1,000,000) (1,000,000) 1 160,000 (840,000) 2 160,000 (680,000) 3 320,000 (360,000) 4 320,000 (40,000) 5 320,000 280,000 Net cash benefits 280,000 280,000 Payback = 4 + 40,000/320,000= 4.125 years 2. Discount cash flow technique(net present value) Calculation of Net Present Value(NPV)at 10% Year Annual cash flow Present value factors at 10% Present Value £ £ £ 0 (1000,000) 1.000 (1,000,000) 1 160,000 0.909 145,440 2 160,000 0.826 132,160 3 320,000 0.751 240,320 4 320,000 0.683 218,560 5 320,000 0.621 198,720 935,200 Net Present Value (NPV) (64,800)
    展开阅读全文

    开通VIP折扣优惠下载文档

    提示  咨信网声明:本文档由用户上传并分享,仅供学习交流、研究之用,未经授权,严禁复制、发行、汇编、翻译或网络传播等,侵权必究。

    咨信网小贴示:
    1、浏览或下载可查看了解,请点击【咨信网告知】。
    2、下载文件中如有侵权或不适当内容,将立即纠正。
    3、如果因为网速或其他原因下载失败请重新下载,重复下载[60天内]不扣币。
    4、开具发票登录电脑端申请,请点击【索取发票】。

    咨信网客服组:【微信客服】

    自信AI创作助手
    关于本文
    本文标题:财政预算报告.doc
    链接地址:https://www.zixin.com.cn/doc/9662271.html

    Copyright ©2010-2026   All Rights Reserved  宁波自信网络信息技术有限公司 版权所有   |  客服电话:0574-28810668    微信客服:咨信网客服    投诉电话:18658249818   

    违法和不良信息举报邮箱:help@zixin.com.cn    文档合作和网站合作邮箱:fuwu@zixin.com.cn    意见反馈和侵权处理邮箱:1219186828@qq.com   | 证照中心

    12321jubao.png12321网络举报中心 电话:010-12321  jubao.png中国互联网举报中心 电话:12377   gongan.png浙公网安备33021202000488号  icp.png浙ICP备2021020529号-1 浙B2-20240490   


    关注我们 :微信公众号  抖音  微博  LOFTER               

    自信网络  |  ZixinNetwork