分享
分销 收藏 举报 申诉 / 6
播放页_导航下方通栏广告

类型Template-for-Site-Specific-Safety-Plan建筑工程安全手册模板(英文).doc

  • 上传人:快乐****生活
  • 文档编号:11150034
  • 上传时间:2025-07-03
  • 格式:DOC
  • 页数:6
  • 大小:122.01KB
  • 下载积分:6 金币
  • 播放页_非在线预览资源立即下载上方广告
    配套讲稿:

    如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。

    特殊限制:

    部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。

    关 键  词:
    Template for Site Specific Safety Plan 建筑工程 安全 手册 模板 英文
    资源描述:
    Site Specific Safety Plan List Project name and Location 1. INTRODUCTION a) Name of organization/company) is committed to the health and safety of our employees. b) Company name has a SAFETY & HEALTH MANUAL, which is a crucial part of this sites specific safety plan. (Every Superintendent should have a copy or has access to one at anytime) c) The health and safety of our employees, our subcontractors, vendors and the general public is the first consideration in the operation of our business, and in particular, this project: (insert project name here) d) It is our goal to establish and maintain safety policies and practices which are in full compliance with all applicable federal, state and local laws, regulations and guidance, especially those issued by Federal OSHA 2. HEALTH AND SAFETY DOCUMENTS a) Contract Documents b) Work-SAFE Program Parts I, II, and III & IV c) All Federal, State and Local Health & Safety requirements 3. EMERGENCY NUMBERS a) Owner’s specific requirements b) Medical Emergency Facility-(for self perform only-Subcontractors required to Facilitate their own plan): (name of the nearest facility) Address: (physical address, city, state and zip code) Telephone ((area code) and phone number) c) Occupational Health Care Services (for non life threatening during available hours): Address: (physical address, city, state and zip code Telephone: (area code) and phone number d) Superintendent’s Number: Mobile number Jobsite Trailer number e) Local Police Dept.: _____________________________________________ f) Local Fire Dept.: _______________________________________________ g) Miss Dig (if applicable) h) Hazmat (for chemical spills and/or toxic releases) 4. EMERGENCY and FIRST AID PROTOCOL a) Each contractor will provide first aid stations, well marked and available to site personnel during all working shifts. b) One person holding a valid first aid and CPR certificate will be responsible for the proper use and maintenance of the first aid station. c) Each contractor will responsible for their own emergency plan. d) There will be a minimum of one (site wide) known person per site with a valid CPR/First Aid certification. e) Emergency procedures are as follows: ü Call for all emergencies Evacuation signals and meeting place ü Fire mustering point is signal is all clear ü Tornado shelter is signal is all clear ü Hazardous chemical mustering point signal is all clear is 5. PROJECT ORGANINZATIONAL CHART & CONTACT INFORMATION {Insert project organization chart and staffing requirements for this site} At the time of this publication, an organizational chart and staffing requirements have not been determined. Upon onset of (companies name) mobilizing on-site and performing their scopes of work a staffing chart will be made available which will include the following: ü Owner and/or Owner Representative: (name and phone number) ü Your Company Site Representative: (name and phone number) ü Your Company Safety Representative: (name and phone number) ü On-site Subcontractors person who is responsible for overall project; (name and phone number) ü On-site Subcontractors that is responsible for safety on this project: (name and phone number) ü Subcontractors Main office: (name and phone number) ü All competent Persons for Hazardous Operations 6. SPECIAL NEEDS of THE CUSTOMER d) Shift times (e.g. 1st shift, 2nd shift, etc.) e) Weekend work f) Restricted Areas g) Smoking Areas h) Children’s presence on or near the site i) Handicapped people on or near the site j) Other public Safety concerns 7. PROTECTION of the GENERAL PUBLIC a) Walkways, Sidewalks, Parking Lots cleared and accessible b) Barricades, Flashing Barrels, “DANGER DO NOT ENTER” postings c) Project signage d) (Any other protection not mentioned needs to be added here) 8. PROTECTION of SITE WORK PERSONNEL a) Work-SAFE Orientation Part I and Jobsite/New Hire Safety Orientation b) Work-SAFE Parts II, III and IV c) MSDS’s and Chemical Inventory Location d) Job Board Location e) REACH Board Location f) Hardhats, Safety glasses with side shields, ear plugs, construction-worthy footwear, gloves, face shields, Safety Vests, and all applicable Personal Protection Equipment g) Any other specialized training that may be specific to this site but not limited to the following; ü Excavation ü Confined space ü Scaffold erection ü Critical Rigging ü Lock Out/ Tag Out 9. PROJECT SAFETY SITE DRAWING a) Site Drawing highlighting b) Hazardous areas ü Excavation areas ü Demolition areas ü Trenching areas, etc. c) Emergency exit routes d) First Aid station e) Employee parking f) Employee breaks areas, etc. g) Job Board h) Reach Board 10. SPECIAL PROJECT HAZARDS This is determined and discussed on a daily basis as the project progresses and the circumstances, project site etc., develops and changes. All Contractors/Subcontractors and/or supervisor must review and document the plan for performing the work task to the employee prior to hazardous operation beginning. (This is not a an inclusive list, each supervisor must use common sense when determining the degree of hazard associate with the task). Note: Pre-Task Planning and Pre-Construction Forms to be utilized (enclosed herein) a) Excavation / Trenching/ Caissons b) Crane lifts and rigging operations c) Confined Space d) Steel Erection/ working from heights e) Roof Top Work-penetrations, roofing installation and or repair etc. f) Working on or around high tension wires g) Demolition h) Traffic Control i) Scaffolds / Ariel lift work j) Working on or around energized equipment or systems k) Use of chemical materials l) Cutting and capping utilities m) Working on or around substations n) Working on or around pits o) Any respirator type activities p) Any use of tar, asphalt kettle or tankers 11. SITE SIGNAGE REQUIREMENTS Project Sign will detail specific information regarding ownership, architectural firm, contractor, etc. a) Any Hazardous chemicals b) Confined Space c) Overhead Wires d) DANGER DO NOT ENTER e) DANGER HARD HATS REQUIRED f) DANGER EYE AND EAR PROTECTION REQUIRED g) MSDS for this are located h) First Aid station i) Job Board complete with all the following current Federal and State postings: j) Right-to-Know postings-One complete set for the site office/Gang box ü Note: Failure to comply with Right-To-Know, Hazardous Materials Communications regulations may result in a fine up to $10,0000 per violation ü OSHA and/or MIOSHA 300 Log (to be posted a minimum from February 1 until April 30) ü Project Safety Site Drawing ü Emergency Procedure ü Emergency Phone Numbers ü Safety progress (if applicable) man hours verses accidents k) REACH Board (if applicable) l) First Aid Stations 12. EMPLOYEE ORIENTATION a) Drug screening per Work-SAFE and/or Owner requirements b) Work-SAFE Part I & Jobsite / New Hire Safety Orientation c) Documentation of equipment certifications d) Documentation of First Aid and CPR certifications 13. SAFETY MEETINGS a) Weekly Tool Box Talks will be held with employees every Note: Subcontractors are required to complete their own Tool Box Talks every . b) Progress meetings will be held every with Safety as the first topic. Any and all problems will be listed and a method for corrective action will be determined and implemented as a result of the meeting. c) Superintendents should walk the project site every with all contractors completing a site inspection of all areas. 14. PROJECT SAFETY DOCUMENTATION Note: all safety related documents will be kept at the job site until the end of the project and then will be stored in accordance with the (company name) record storage policies. a) A completed OSHA/MIOSHA 300A “Summary of work Related Injuries and Illness” for each contractor/subcontractor (to be collected at the end of the project) b) A safety and Health Plan from each Contractor/Subcontractor c) A site safety plan for each site and for each contractor/subcontractor (if applicable) d) All completed Pre-task plans for self perform (and subcontractors if applicable) e) All completed Job Site / New Hire Safety Orientation Forms (subcontractors if applicable) f) All meeting minutes g) All completed site inspections h) All daily reports for self perform (and subcontractors if applicable) i) All completed Accident/Incident and Near Miss Reports for the project 15. REPORTING REQUIRMENTS a) Accident /Incident or any near misses will be reported as follows: ü Verbal immediately ü Draft report before the end of the business day ü Final report within (3) business days b) Man-hours weekly from self perform and subcontractors if applicable c) Any unsafe acts that are life threatening and/or repeat offenders 16. ACCIDENT/INCIDENT FOLLOW-UP a) Root cause Analysis (5 why’s)-document b) Corrective Actions-document 6/25/2025 6 of 6
    展开阅读全文
    提示  咨信网温馨提示:
    1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
    2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
    3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
    4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前可先查看【教您几个在下载文档中可以更好的避免被坑】。
    5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
    6、文档遇到问题,请及时联系平台进行协调解决,联系【微信客服】、【QQ客服】,若有其他问题请点击或扫码反馈【服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【版权申诉】”,意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:0574-28810668;投诉电话:18658249818。

    开通VIP折扣优惠下载文档

    自信AI创作助手
    关于本文
    本文标题:Template-for-Site-Specific-Safety-Plan建筑工程安全手册模板(英文).doc
    链接地址:https://www.zixin.com.cn/doc/11150034.html
    页脚通栏广告

    Copyright ©2010-2026   All Rights Reserved  宁波自信网络信息技术有限公司 版权所有   |  客服电话:0574-28810668    微信客服:咨信网客服    投诉电话:18658249818   

    违法和不良信息举报邮箱:help@zixin.com.cn    文档合作和网站合作邮箱:fuwu@zixin.com.cn    意见反馈和侵权处理邮箱:1219186828@qq.com   | 证照中心

    12321jubao.png12321网络举报中心 电话:010-12321  jubao.png中国互联网举报中心 电话:12377   gongan.png浙公网安备33021202000488号  icp.png浙ICP备2021020529号-1 浙B2-20240490   


    关注我们 :微信公众号  抖音  微博  LOFTER               

    自信网络  |  ZixinNetwork