电气电子产品类强制性认证实施规则家用和类似用途设备.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 电气 电子 品类 强制性 认证 实施 规则 家用 类似 用途 设备
- 资源描述:
-
Ref . No. CNCA-01C-016:2001 IMPLEMENTATION RULES FOR COMPULSORY CERTIFICATION OF ELECTRICAL AND ELECTRONIC PRODUCTS Household and Similar Use Appliances Announced on Dec.7, 2001 Implemented on May 1, 2002 Certification and Accreditation Administration of People’s Republic of China contents 1. Scope 3 2. Certification model 3 3. Major processes for certification 4 3.1Application for certification 4 3.2Type testing 4 3.3Initial inspection of the factory 4 3.4Evaluation of certification results and approval of certification 4 3.5Follow-up inspection 4 4. General requirements for certification 4 4.1Application for certification 4 4.2 Type testing 5 4.3 Initial inspection of the factory 6 4.4 Evaluation of certification results and approval of certification 7 4.5 Follow-up inspection 8 5. Certificate 9 5.1 The validity of the certificate 9 5.2 Change of the certified product 10 5.3 Extension of certified products 10 5.4 Suspension, cancellation and withdrawal of the certificates 11 6. Use of compulsory product certification mark 11 6.1 Design of the mark allowed to use 11 6.2 Derivations of certification mark 11 6.3 Ways of use 12 6.4 Location of the mark 12 7. Charge 12 Appendix 1 13 Appendix 2 15 Appendix 3 18 Appendix 4 19 Appendix 5 21 Appendix 6 22 IMPLEMENTATION RULES FOR COMPULSOEY CERTIFICATION OF ELECTRICIAL AND ELECTRONIC PRODUCTS Household and Similar Use Appliances 1. Scope This document applies to household electric appliances and similar use. It includes: Household refrigerator Food freezer Electric fan Air-conditioner Washing machines Storage water heaters Room heaters Vacuum cleaners Appliances for skin and hair care Instantaneous water heaters Electric irons Electromagnetic ovens Roasters Electric food processors Microwave ovens Cooking ranges, cooking table, ovens and similar appliances Range hoods Appliances for heating liquids Electric rice cookers Water dispensers Motor-compressors 2. Certification model Type testing + Initial inspection of the factory + Follow-up inspection 3. Major processes for certification 3.1Application for certification 3.2Type testing 3.3Initial inspection of the factory 3.4Evaluation of certification results and approval of certification 3.5Follow-up inspection 4. General requirements for certification 4.1Application for certification 4.1.1 Defining application unit for certification 4.1.1.1 In principle, application unit (see appendix 1) shall be defined according to different product families, models /types, specifications, working principles, constructions in terms of product safety, the components having significant influence on EMC performance (see the components with * of appendix 5). 4.1.1.2 In principle, the application shall be made according to application unit. The products, of same model/type, of same manufacturer, but from different manufacturing premises, shall be in different application units, but only one type testing is required. 4.1.2 Application documents The formal application shall be submitted with the following documents: 1) Product assembly chart, circuit diagram; 2) List of critical components and/or materials 3) Description of the difference between the different model/type of products in the same application unit. 4) Other necessary documents. 4.2 Type testing 4.2.1 Sample delivery for type testing 4.2.1.1 The principles of sample delivery for type testing The representative samples from the units of application for certification shall be selected and supplied for type testing. According to requirements, samples of other products covered by the application unit should be supplied for additional testing on differences. 4.2.1.2 Samples quantity/amount requirements The applicants shall take responsibility of sample delivery for type testing in accordance with the requirements of the certification body and be responsible for them. The quantities of samples shall be according to the requirements of appendix 3 and those for components tested accompanying the appliances shall be according to the requirements of appendix 4. 4.2.1.3 Handle of samples and relating documents after type testing The samples tested and/or the relating documents should be handled in appropriate ways after type testing. 4.2.2 Test standards, items and methods for type testing 4.2.2.1 Test standards The test standards for certification are specified in appendix 2. 4.2.2.2 Test items 1) Test items for safety The test items for safety shall include all appropriate items specified in standards. Test items for EMC a. 0.15MHz~30MHz radio continuous disturbance voltage (GB4343-1995) b. 30MHz~300MHz radio continuous disturbance power (GB4343-1995) c. 0.15MHz~30MHz radio discontinuous disturbance voltage (GB4343-1995) d. Limits for the harmonic current emissions (GB17625.1-1998) 4.2.2.3 Test methods The type testing shall be carried out according to the methods specified and/or referred in the standards. 4.3 Initial inspection of the factory 4.3.1 Contents of the inspection The contents of factory inspection shall include the factory quality assurance ability assessment and the products consistency check. 4.3.1.1 Assessment of factory quality assurance ability. The inspector assigned by the certification body shall carry out the factory quality assurance capability assessment according to the Requirements for Factory Quality Assurance Ability (see appendix 6) and the additional inspection requirements stipulated by CNCA. 4.3.1.2 Check of consistency of the product The consistency of the product applying for certification shall be checked on the site of production. If more than one application unit are involved in the certification, at least one type/model sample shall be taken from each unit for the product consistency check. The following major points shall be checked: 1) The name of product, type/model and specification on the nameplates and packages of products to be certified shall be identical with those indicated in the type testing reports. 2) The constructions of products to be certified (mainly constructions in terms of safety and EMC performance) shall be identical with those of the samples for type testing. 3) The critical components in terms of safety and components having significant influences on EMC shall be identical with those declared in type testing and confirmed by certification body. The witness tests on site, if necessary, should be carried out to confirm safety and EMC performance of the products during the factory inspection. 4.3.1.3 Inspection scope All the products to be certified and processing premises shall be covered for inspection of factory quality assurance ability and of consistency of the products. 4.3.2 Timing of factory inspection Normally, the initial inspection should be implemented after the sample has passed the type testing. The type testing and factory inspection can be implemented at the same time in special cases. The duration of factory inspection shall be determined by the amounts of application units of products to be certified and with the consideration of the scale of the factory. It will normally take about 1 to 4 man-day for each processing premises. 4.4 Evaluation of certification results and approval of certification 4.4.1 Evaluation of certification results and approval of certification The certification body shall be responsible for a general evaluation of the results of type testing and factory inspection and for issuing the certificates to the applicants for the conformed products. One certificate shall be issued for one application unit. The application of the certificates shall comply with the requirements for Regulations for Compulsory Product Certification. 4.4.2 Time frame Time frame for certification means the working days from the acceptance of complete application till the issuance of the certificates, which includes the time of type testing, factory inspection, reports submission after inspection, evaluation of certification results and approval of certificates, etc. Normally, type testing takes 30 working days, not including the time for corrective actions and retest of the non-conformity item(s). If the components are required to be tested and the required time exceeds that of appliances, the time of type testing should be calculated according to the longest test time of the component, counting upon the receipt of the samples and testing fees. The inspection reports should be submitted within 5 working days after the inspection. It will be counted from the day when the inspectors complete the inspection and receive from the factory the corrective action reports on non-conformities satisfying the requirements. Evaluating certification results and approving the certificates shall normally be completed within 5 working days. 4.5 Follow-up inspection 4.5.1 The frequency of follow-up inspection The follow-up inspection shall normally be implemented at least once per year. The first follow-up inspection shall normally be implemented 12 months after the certificate being granted. The frequency of inspection should be increased in any of the following cases: 1) The certified product has serious quality problem, or is complained by clients, which has been verified to be the responsibility of the certificate holder. 2) The certification body doubts the conformity of the certified product against the requirements of safety and EMC standards with sufficient reasons. 3) Sufficient information indicates that the conformity or the consistency of certified products might be affected due to the changes in organization structure, production condition and the quality system of the manufacturer and/or factories. 4.5.2 Contents of the follow-up inspection The model of follow-up inspection: re-assessment of factory quality assurance ability + check of consistency of products certified, and if necessary, samples may be taken and tested at the testing laboratories. The certification body shall implement the factory re-assessment in accordance with Requirements for Factory Quality Assurance Ability (see appendix 6). The items 3, 4, 5 and 9 specified in Requirements for Factory Quality Assurance Ability must be assessed for follow-up inspection and the rest items may be selected. All the items of the Requirements shall be covered at least every four years. The duration for follow-up inspection shall be determined by the amounts of units of certified products with appropriate consideration of the production scale of the factory. It will normally take about 1 to 2 man-day. 4.5.3 Sampling & testing If necessary, the certified products should be sampled and tested. The samples shall be taken randomly from the qualified products of the factory (including those from production line, stock and market). The designated testing bodies shall be responsible for testing. The methods and requirements for sampling shall be carried out according to the relevant specifications of the certification body. The test items specified in the standards for certification can be applied to testing. The certification body may carry out part or all of test items based on the degree of effects on the safety and/or EMC performance of the products. 4.5.4 Evaluation of follow-up inspection results The certificates can be retained and the certification marks can be continuously used upon favorable inspection results. If there is any non-conformities found in the follow-up inspection, the corrective actions shall be taken within three months. Otherwise, the certificates will be withdrawn, the certification marks will be stopped using, and the relevant results will be announced. 5. Certificate 5.1 The validity of the certificate The certificate of the products covered by this Rules itself doesn’t indicate specific expiry date. The validity of the certificate depends on the follow-up inspection. 5.2 Change of the certified product 5.2.1 Applying for change of certified product Should any change occur in the specification, type/model of the components listed in appendix 3 of the certified products or the design, electric construction involved in safety or EMC of the appliances, the application for approving/recording the change shall be made to the certification body. 5.2.2 Evaluation and approval of change The certification body shall evaluate the change according to the submitted information and confirm whether it can be approved or samples should be submitted for tests. If test is necessary, the change will be approved upon favorable test result. 5.3 Extension of certified products 5.3.1 Procedure for extension For extension of the range of products covered by the unit of certified products, the certificate holder shall first make application. The certification body shall check the consistency of the extended products against the certified products and confirm the applicability of the original certification results to the extended products and carry out, if necessary, the additional test or inspection based on the differences. After approval, either a separate certificate can be issued or the original certificate can be updated at the request of the certificate holder. 5.3.2 The requirements for sample The certificate holder shall first submit the technical documents related to the extended products. And, if necessary, one sample may be required by the certification body according to the requirements of Clause 4.2 of this Rules, for which the testing items shall be decided by the certification body. 5.4 Suspension, cancellation and withdrawal of the certificates The suspension, cancellation and withdrawal of the certificates shall follow Regulations for Compulsory Product Certification. 6. Use of compulsory product certification mark The certificate holder shall follow the Regulations for Compulsory Product Certification Mark 6.1 Design of the mark allowed to use The certification mark with letter reference “S”(as below) shall be used for certification involving safety only: The certification mark with letter reference “ S&E” (as below) shall be used for certification involving both safety and EMC: 6.2 Derivations of certification mark The products listed in this Rules shall not be allowed to use any derivation of certification mark. 6.3 Ways of use Any of the following three ways is required: affixing standard-size marks (labels) printed only by CNCA, printing on the nameplate or moulding. 6.4 Location of the mark The certification mark shall be applied on an expo展开阅读全文
咨信网温馨提示:1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前可先查看【教您几个在下载文档中可以更好的避免被坑】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时联系平台进行协调解决,联系【微信客服】、【QQ客服】,若有其他问题请点击或扫码反馈【服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【版权申诉】”,意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:0574-28810668;投诉电话:18658249818。




电气电子产品类强制性认证实施规则家用和类似用途设备.doc



实名认证













自信AI助手
















微信客服
客服QQ
发送邮件
意见反馈



链接地址:https://www.zixin.com.cn/doc/7027438.html