地基基础质量检试验计划 Inspection and Testing Plan for Base Foundation Quality INSPECTION AND TESTING PLAN FOR BASE FOUNDATION QUALITY REV DESCRIPTION ORIG CHKD APPR DATE CLIENT APPROVAL DATE A Issued for Comments 目录 TABLE OF CONTENTS 1. 本工程应执行的标准、规范 Applicable Codes and Standards 3 2. 本工程质量控制点 Quality Control Point 5 3. 本工程质量控制表格、交工资料表格及质量评定表格目录 Applicable forms for quality control, turnover document, and quality evaluation 13 1. 本工程应执行的标准、规范 Applicable Codes and Standards z 监理规范 Code on Supervision: GB 50319-2000《建设工程监理规范》 Code on Supervision of Construction Project, GB50319—2000 z 交工技术文件规定 Regulation on Technical Turnover Document: SH 3503-2001《石油化工工程建设交工技术文件规定》 Regulation of Technical Turnover Document for Construction of Petrochemical Industry Project, SH3503—2001 GB/T 50328-2001《建设工程文件归档管理规范》 Regulation on Documentation and Filing up for Construction Project, GB/T 50328-2001 GB/T 50326-2001《建设工程项目管理规范》 Code on Project Management of Engineering Construction, GB/T 50326-2001 z 技术规范 Technical Codes and Standards: GB 50202-2002《建筑地基基础工程施工质量验收规范》 Code on Construction Quality and Acceptance Inspection of Building Foundation Work, GB50202-2002 SH 3510-2000《石油化工设备砼基础工程施工及验收规范》 Code on Construction Quality & Acceptance Inspection of Reinforced Concrete Foundation of Petrochemical Equipment, SH 3510-2000 GBJ 120-1999《建筑基坑支护技术规程》 Specification on Technology of Building Foundation Pit Shoring, GBJ 120-1999 GB 50330-2002《建筑边坡工程技术规范》 Code on Technology of Side Slope Work of Building Construction, GB 50330-2002 GBJ 79-2002《建筑地基处理技术规范》 Code on Foundation Treatment Technology of Building Construction, GBJ 79-2002 GB 50204-2002《砼结构工程施工质量验收规范》 Code on Quality Acceptance Inspection of Reinforced Concrete Structure Construction, GB 50204-2002 JGJ 55-2000《普通砼配合比设计规程》 Specification on Engineering of Mixing Proportion of Ordinary Concrete, JGJ 55-2000 JGJ 52-1992《普通砼用砂质量标准及检验方法》 Standard on Quality & Inspection Method of Sand Application in Ordinary Concrete, JGJ 52-1992 JGJ 94—94《建筑桩基技术规范》 JGJ 94—94 Technical Code of Building Foundation Piles GBJT 08-92-2000《先张法预应力砼管桩》 GBJT 08-92-2000《Pre-stressed Concrete Pipe Piles》 97G361《方桩标准图集》 97G361《Square Pile Standard Collective Drawing》 JGJ 53-1992《普通砼用碎石和卵石质量标准及检验方法》 Standard on Quality & Inspection Method of Gravel and Pebble Application in Ordinary Concrete, JGJ 53-1992 GBJ 119-1988《砼外加剂应用技术规范》 Code on Technical Application of Reinforced Concrete Additives, GBJ 119-1988 GB 50300—2001 《建筑工程施工质量验收统一标准》 GB 50300—2001 《Building Engineering Construction Quality Acceptance Uniform Standard》 z 砼预制桩、PHC 桩、灌注桩及基础设计文件及图纸资料 Reinforced Concrete Prefabricated Piles, PHC Piles, Grouting Piles and Foundation Design Document as well as Drawing Document 2. 本工程质量控制点 Quality Control Point 序号 质量控制点 控制内容 控制方法 等级 参 加 单 位 控制表格 验收表格 评定表格 总承 包商 监 理 MWP 业 主 政府 部门 1 定位测量 复核测量结果 仪器实测 A X X X X SH3503-2001-J202 GB50026-93 2 土方开挖 基坑、边坡 实测 C X GB50202-2002-010101 3 基坑支护 支护、堆载、排水 C X GB50330-2002 JGJ120-99 4 地基处理 主控项目 1~3 密实度、承载力 取样、试验³10%。不少于 3 点 见 4.1.5, 4.1.6 B X X X GB50202-2002- 010301~010304 JGJ 79-2002 5 地基验槽 主控项目 1~3 持力层、标高、平 面尺寸 实测、钎探记录 A X X X X SH3503-2001-J201 GB50202-2002 6 预制桩(含 PHC 桩) 主控项目 1~3 桩位偏差 承载力 钢筋骨架质量 成品桩质量 实测、承载力报告 桩位偏差 见 5.1.3 承载力 见 5.1.5 钢筋骨架质量 抽查数量不少于总 数的 20%且不少于10 根见5.1.6 成品桩质量 抽查数量不少于总数 的 20%且不少于 10 根 见 5.1.6 抽样 0.5%~1%. 不少于 3 根(处) 见 4.1.6, 5.1.5, 5.1.6 B X X X GB50202-2002-010403 7 打、接桩 焊缝质量 上下节平面偏差 节点弯曲矢高 间歇时间、桩垂直度、最终贯入度 实测 C X GB50202-2002-010403 8 打桩完毕 主控项目 1~3 1.桩顶标高 2.桩位、垂直度偏差 3.承载力检验、桩身完整性检验 实测、试验 其中 1 和 2 应Ê20%且不少于10 根,见 5.1.6 3 应³10%且大于等于 3 根。当桩 数小于 50 根时,应不少于 2 根。 见 5.1.6, 5.1.5 B X X X GB50202-2002-010403 9 灌注桩 (灌注前) 主控项目 1~2 桩位、孔深 试验报告、实测 1.桩位 不少于 30%且不应少于 20 根 见 5.1.5 2.孔深 孔深应全部检查 见 5.1.8 B X X GB50202-2002-010405 10 灌注桩 (灌注中) 主控项目 1~5 成孔、清孔质量 钢筋笼安装深度 砼充盈系数、桩径、垂直度 实测 1.桩位 不少于 30%且不应少于 20 根 见 5.1.5 2.孔深 孔深应全部检查 见 5.1.8 C X GB50202-2000-010405 11 灌注桩 (灌注后) 桩顶标高、锚固钢筋 桩位、垂直度偏差 承载力检验、桩身完整性检验 实测、试验 1.桩位 不少于 30%且不应少于 20 根 见 5.1.5 2.孔深 孔深应全部检查 见 5.1.8 C X GB50202-2002-010405 12 桩承台 主控项目 1~4 轴线位置、 平面尺寸、标高、 钢筋规格、数量、位置 试验 实测 抽查构件数量的 10%,且不少于3 件,见 5.5.2 B X X X GB50204-2002-010603、010604 13 设备基础 主控项目 1~4 轴线、方位、标高、 预留孔洞或螺栓、 预埋件 试验全数检查 见 8.3.1 实测全数检查 见 8.3.2 B X X X GB50204-2002-010603、010604 SH3510-2000---3.3.11-1 14 模板工程 几何尺寸、支护稳定 实测 C X GB50204-2002-010601 15 钢筋工程 主控项目 1~3 原材检验 品种、级别、规格、数量 见证取样应取样数量的 30% 复试报告 实测 全数检查,观察,钢尺检查 见 5.2.4, 5.5.1 B X X X GB50204-2002-010602 SH3510-2000---3.2.9 、3.2.11 16 隐蔽工程 平面尺寸、标高、 预留空洞或螺栓、钢筋 品种、级别、规格、数量 实测 A X X X X SH3503-2001---J115 GB 50204-2002 17 砼浇注前 原材检验报告 见 7.2.1 配合比试验报告,检查配合比设计资料见 7.3.3 见证取样³应取样数量的30% 试验报告,每周工作班检查 1 次实测 B X X GB50204-2002 JGJ55-2000 JGJ 52-1992 JGJ 53-1992 GBJ 119-88 18 块体式 设备基础 主控项目 1~2 位置、平面尺寸、标高、 预留空洞或螺栓、钢筋 实测 全数检查 见 8.3.1, 8.3.2 B X X X SH3503-2001-J204 GB 50204-2002-020105 SH3510-2000 3.3.11-1 19 整体框架式 设备基础 主控项目 1~2 平面尺寸、垂直度、标高、 预留空洞或螺栓、钢筋 实测 全数检查 见 8.3.1, 8.3.2 B X X X SH3503-2001-J205 GB 50202-2002 GB 50204-2002-020105 SH3510-2000 3.3.11-2 20 储罐基础 主控项目 1~2 基础中心位置、标高偏差 直径偏差 实测 全数检查 见 8.3.1, 8.3.2 B X X X SH3503-2001---J206 SH3510-2000---3.3.11-1 GB50204--2002 21 球罐基础 主控项目 1~2 平面、方位、标高偏差 预留孔、螺栓偏差 实测 全数检查 见 8.3.1, 8.3.2 B X X X SH3503-2001---J207 SH3510-2000---3.3.11-1 GB50204--2002 22 大体积砼基础 水泥品种和用量 砼配合比和水灰比 散热管布置 试验报告、实测 全数检查 见 8.3.1, 8.3.2 B X X X SH3510-2000---3.3.11-1 23 预埋件、螺栓、套 管、孔洞 位置、埋深、锚固方式 实测 C X SH3510-2000---5.3.8 24 灌浆 接触面 孔洞清理 灌浆料强度 实际检查 试验报告 C X SH3510-2000 25 基础沉降观测 设备安装前、安装后、水压试验 中、单机试车后观测点沉降值 实测 C X SH3503-2001---J207 SH3510-2000 26 基础复测 位置、平面尺寸、标高、 预留空洞或螺栓、钢筋 实测 应抽查基础数量的 10%,且不少于3个,见 8.3.2 B X X X SH3503-2001---J203 GB50204--2002 27 土方回填 密实度 取样、试验 1000M2 以上,1 点 /100 M2;3000 M2 以上,1 点/300M2 C X GB50202-2002-010102 28 基础验收 外观检查 资料检查 A X X X X No. Quality Control Point Control Content Control Method Grade Party Involved Applicable Forms Contractor Supervision Organization MWP Owner Government Agency 1 Location survey Checking survey result Actual measurement by instrument A X X X X SH 3503-2001-J202 GB50026-93 2 Earthwork Excavation Foundation pit and side sloping Actual measurement C X GB50202-2002-010101 3 Foundation Pit Shoring and Protection Shoring and protection, laydown and bearing, water drainage C X GB50330-2002--- JGJ120-99 4 Ground Treatment Main Control Item 1-3 Compactness, bearing capacity Sampling, sampling test³10%, not less than 3 points, see 4.1.5, 4.1.6 B X X X GB50202-2002-010301 ~010304 JGJ 79-2002 5 Ground Inspection Main Control Item 1-3 Ground bearing course, elevation, plane dimension Actual measurement, ground bearing capacity test record A X X X X SH3503-2001-J201 GB50202-2002 6 Pre-cast Piles (PHC piles included) Main Control Item 1-3 Pile position deviation, and Bearing capacity, Quality of reinforcement joist, Quality of pre-cast pile Actual measurement, Bearing capacity report, Pile position deviation see point 5.1.3; Bearing capacity see 5.1.5; Spot check quality of reinforcement joist, quantity of spot check is not less than 20% of total amount and not less than 10 pieces, see 5.1.6, the rate of spot check is 0.5%~1%. Not less than 3 pieces (location), see 4.1.6, 5.1.5, 5.1.6 B X X X GB50202-2002-010403 7 Piling, Pile Extension Connection Welds quality, Flatness deviation of joints, Bending Vector height of joints, interval time, pile verticality, final penetration Actual measurement C X GB50202-2002-010403 8 Piling Completion Main Control Item 1-3 1. Elevation of pile top; 2. Pile position, verticality deviation; 3. Bearing capacity inspection, Completeness inspection of pile body Actual measurement, Testing; For point 1and 2, inspection rate shall be ³20% and not less than 10 pieces, see 5.1.6; For point 3, inspection rate shall be ≥ 10% and not less than 3 pieces. When quantity of the pile is less than 50 pieces, piles for inspection shall be not less than 2 pieces. See 5.1.6, 5.1.5 B X X X GB50202-2002-010403 9 Driven Cast- in- Place Pile (Prior to pouring) Main Control Item 1-2 Pile position; hole depth Testing report, actual measurement; 1.Pile position, not less than 30% and not less than 20 pieces, see 5.1.5 2.Holes depth, all of them shall be checked. See 5.1.8 B X X GB50202-2002-010405 10 Driven Cast- in- Place Pile (During pouring) Main Control Item 1-5 Quality of hole formation and hole cleaning; Installation depth of steel cages; Concrete allowance coefficient, pile diameter and verticality Actual measurement 1.Pile position, not less than 30% and not less than 20 pieces, see 5.1.5 2.Holes depth, all of them shall be checked. See 5.1.8 C X GB50202-2000-010405 11 Driven Cast- in- Place Pile (After pouring) Main Control Item 1-5 Elevation of pile top, anchoring bar, pile position, verticality deviation, bearing capacity inspection, completeness inspection of pile body Actual measurement, Testing 1.Pile position, not less than 30% and not less than 20 pieces, see 5.1.5 2.Holes depth, all of them shall be checked. See 5.1.8 C X GB50202-2002-010405 12 Pile Cap Main Control Item 1-4 Position of axial, plane dimension, elevation, Rebar specification, quantity and position Testing Actual measurement, members for spot check are 10% and not less than 3 pieces, See 5.5.2 B X X X GB50204-2002-010603 、010604 13 Equipment foundation Main Control Item 1-4 Axial line, orientation, elevation preserved holes, bolts and fittings, and embedded parts Testing, complete inspection. See 8.3.1 Actual measurement, total inspection. See 8.3.2 B X X X GB50204-2002-10603, 010604 SH3510-2000--3.3.11-1 14 Forming Work Geometric dimension Support stability Actual measurement C X GB50204-2002-010601 15 Rebar Work Main Control Item 1-3 Raw material inspection, type, grade, specification, quantity Sampling verification, sampling quantity is 30% of total; Re-testing report; Actual measurement, total inspection, observation, steel rule measuring. See 5.2.4, 5.5.1 B X X X GB50204-2002-010602 SH3510-2000---3.2.9,3.2.11 16 Concealed Work Plane dimension, elevation, Built-in holes, bolts and rebar, type, grade, specification, quantity Actual measurement A X X X X SH3503-2001-J115 GB 50204-2002 17 Prior to concrete pouring Raw material inspection report, see 7.2.1 Mixing proposition testing report, Mix design data inspection Sampling verification, sampling quantity is 30% of total; Testing report, 1 time inspection for weekly shifts; Actual measurement B X X GB50204-2002 JGJ55-2000 JGJ 52-1992 JGJ 53-1992 GBJ 119-88 18 Massive Equipment Foundation Main Control Item 1-2 Position, plane dimension, elevation, preserved holes, bolts and rebar Actual measurement, Total inspection see 8.3.1, 8.3.2 B X X X SH3503-2001-J204 GB 50202-2002-020105 SH3510-2000--3.3.11-1 19 Massive Frame Equipment Foundation Main Control Item 1-2 Plane dimension, verticality, elevation, built-in holes, bolts and rebar Actual measurement, Total inspection see 8.3.1, 8.3.2 B X X X SH3503-2001-J205 GB 50202-2002 GB 50204-2002-020105 SH3510-2000--3.3.11-2 20 Storage Tank Foundation Main Control Item 1-2 Plane, orientation, elevation deviation, preserved holes, bolts deviation Actual measurement, Total inspection see 8.3.1, 8.3.2 B X X X SH3503-2001-J206 SH3510-2000--3.3.11-1 21 Spherical Tank Foundation Deviation in plane, orientation, elevation, deviation of built-in holes, bolts Actual measurement, Total inspection see 8.3.1, 8.3.2 B X X X SH3503-2001-J207 SH3510-2000--3.3.11-1 GB 50204-2002 22 Mass Concrete Foundation Cement brand and quantity, mixing proportion and water-cement ratio, distribution of heat dissipation tubes Testing report, Actual measurement, Total inspection see 8.3.1, 8.3.2 B X X X SH3510-2000--3.3.11-1 23 Embedded parts, bolts, sleeves, holes and openings Position, embedded depth, anchoring mode Actual measurement C X SH3510-2000---5.3.8 24 Grouting Contacting surface, holes cleaning, grouting material strength Actual inspection Testing report C X SH3510-2000 25 Foundation Settlement Observation Settlement value observation before and after equipment installation, during hydro test, after individual test run Actual measurement C X SH3503-2001-J207 SH3510-2000 26 Foundation Re- survey Location, plane dimension, elevation, preserved holes, bolts and rebar Actual measurement, quantity for spot check shall be 10% of total foundation and not less than 3 pieces, see 8.3.2 B X X X SH3503-2001-J203 GB 50204-2002 27 Earthwork Backfill Compactness check Sampling and sampling test. For area 1000m2 above, 1 point/ 100 m2; For area 3000 m2 above, 1 point/ 300 m2 C X GB50202-2002-010102 28 Foundation Acceptance Inspection Visual inspection, document check A X X X X 3. 本工程质量控制表格、交工资料表格及质量评定表格目录 Applicable forms for quality control, turnover document, and quality evaluation SH3503-2001- J202 放线测量验收记录 Record of Setting Out and Survey Inspection & Acceptance, SH3503-2001- J202 GB50202-2002- 010101 土方开挖质量验收记录 Record of Earth Work Excavation Quality Inspection & Acceptance, GB50202-2002- 010101 GB50202-2002- 010102 土方回填质量验收记录 Record of Earth Work Backfill Quality Inspection & Acceptance, GB50202-2002- 010102 GB50202-2002-010301~010314 地基处理质量验收记录 Record of Ground Treatment Quality Inspection & Acceptance, GB50202-2002-010301~010314 GB50202-2002-010201~010207 基坑支护质量验收记录 Record of Foundation Pit Shoring Quality Inspection & Acceptance, GB50202-2002-010201~010207 SH35O3-2001- J201 地基验槽 Record of Ground Inspection, SH35O3-2001- J201 GB50204-2002-010602 钢筋工程质量验收记录 Record of Quality Inspection & Acceptance of Rebar Work, GB50204-2002-010602 GB50204-2002- 010601 模板工程质量验收记录 Record of Quality Inspection & Acceptance of Formwork, GB50204-2002- 010601 SH35O3-2001- J115 隐蔽工程质量验收记录 Record of Quality Inspection & Acceptance of Concealed Work, SH35O3-2001- J115 GB50202-2002- 010401~010405 桩基础质量验收记录 Record of Quality Inspection & Acceptance of Pile Foundation, GB50202-2002- 010401~010405 SH35O3-2001- J20展开阅读全文
咨信网温馨提示:1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前可先查看【教您几个在下载文档中可以更好的避免被坑】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时联系平台进行协调解决,联系【微信客服】、【QQ客服】,若有其他问题请点击或扫码反馈【服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【版权申诉】”,意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:0574-28810668;投诉电话:18658249818。




中英文对照地基基础施工质量计划.doc



实名认证













自信AI助手
















微信客服
客服QQ
发送邮件
意见反馈



链接地址:https://www.zixin.com.cn/doc/4691806.html