马来西亚建筑工程标准计量规则第二版(英文版).doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 马来西亚 建筑工程 标准 计量 规则 第二 英文
- 资源描述:
-
PREFACE TO THE SECOND EDITION Ever since the first edition of the SMM made its appearance in 1960 the building industry has seen many changes and innovations in methods and modes of construction. This has resulted in demands for an efficacious communication and cost controlling tool for the benefit of better management and eflective monitoring of the works. The need for a new SMM is premised on these requirements. The first Sub-Committee under Mr. Cheah Kow Chye was set up under instruction of the Quantity Surveying Sectional Committee of The Institution of Surveyors, Maiaysia in 1984 to look into this and thereafler Mr. Noel Lim took over the chair of the Sub-Committee in 1989 when the decision to adopt the British SMM6 as a basis for our proposed second edition was made and agreed upon We have since obtained endorsement from the Royal Institution of Chartered Surveyors (RICS) to enable us to use the SMM6 for this purpose and would express our gratitude to them. This Committee is glad that this second edition has come to fruition albeit after taking enough time to overcome the endless discussions and deliberations on matters technical, social and economics. We have been able to draw upon the knowledge and experiences of both members of the above Committees to provide inputs and comments relevant to this exercise. All suggestions, observations and comments received have been carefUlly considered and weighed in the context of current practices, and incorporated into this edition where appropriate. This edition should reflect a reference which is true to tradition and yet flexible for modern use. Due to the ongoing changes in information technology one shoUld reflect on the changes that have to come to accommodate on-line BQ production techniques; it would be pertinent to note that a future edition to accommodate this is inevitable. Perhaps this edition will provide the adequate milestones to move to the next stage synchronous with developments in new mUIti media technologies. The Committee would wish to thank those who have spent time in giving points and ideas which have been adopted and those who are not Committee members but have given assistance to us viz. Cawangan Ukur Bahan & Kontrak Jabatan Kerja Raya, Kementerian Keria Raya Malaysia, the InstitUtion of Surveyors, Malaysia, the Department of Quantity Surveying of the Universiti Teknologi Malaysia (UTM) and Universiti Teknologi Mara (UiTM) and the Department of Building of the Tunku Abdul Rahman (TAR) College; we are gratefUI for your contributions. Members of the Committee are: Encik Andrew Ng Shou Guan Encik Mohd Fadhil b Muhammad Puan Nor Ainah AbdUllah PUan Oh Chin Choo Encik Raden Mohd PUjaseti Hj. Asnawi Prof. Madya Dr Rosli Abdul Rashid Encik Wong Weng Hong Hj. Mokhtar Puteh Chairman, SMM Sub Committee, Session 1998-2000 May, 2000 1 Preface to the First Edition 1959 Since the introduction of the use of the Bills of Quantities to the Building Trade in Singapore and Malaya, as from the eany nineteen thinties, The STANDARD METHOD of MEASUREMENT of BUILDING WORKS, as published in England by The Royal Institution of Chartered Surveyors, has been adopted as a broad basis for measurement, with modifications to suit the individual requirements of Contracting Departments or the demands of local conditions and practice. However, until now, these modifications have never been agreed or standardized among Quantity Surveyors. Consequenly, Surveyors in Government and Service Departments and in private practice have been measuring, classifying and describing virtually the same items of construction in various ways, each Surveyor either trying to keep to an accepted style and practice set by his predecessor, or, very often, trying to introduce what he considers to be a better method or system. The need for standardization is therefore very obvious and has been felt for a long time. In fact, an unsuccessful attempt was made to draw up a Revised Standand Method of Measurement for Singapore and Malaya before the Second World War and in 1956 the War Office issued Rules of Measurement to Standardize Bills of Quantities in respect of work for the War Department, Admiralty and Air Ministry, but they were intended only for Departmental use. In September, 1957, a Sub-Committee of the then Malaya Branch of the Royal Institution of Chartered Surveyors, comprising members of long experience in the Federation of Malaya and Singapore was formed, witlh the authority of the Institution, to revise and alter the English SMM accordingly to suit our local needs and practice. This first Edition is the result. Primarily, the English Standard Method of Measurement (4t h Edition) remains the basis of this document. The Sub Committee did not atempt to re-wnte completely the English SMM but generally deleted non-applicable items and items of minor importance, especially those involving labour only and incorporated them into other major basic items and added new items to suit our local labour requirements and trade practices. In effect the principles of measurement and description established herein amount to an amalgamation or compromise of the practices of Surveyors in the Government, War Department, Admiralty, Air Ministry and private firms. Upon completion of the proposed revisions, draft copies were sent to all interested Surveyors in private practice, Government and Service Departments and to Contractors' Association of the Federation of Malaya and Singapore, with invitations for their comments and suggestions. Many were received and all opinions expressed were carefully weighed and considered by the Sub-Committee before adoption or rejection. In submitting this First Edition of the Standand Method of Measurement of Building Works for Use in the Federation of Malaya, Singapore and Borneo, the Sub-Committee wishes to state that it is the expressed wish of the Branches of the Federation of Malaya and Singapore that it will be adopted by all Quantity Surveyors in the designated areas upon its official publication. The members of the Sub Committee are M.H. Seah (Chairman), R.N.S. Rhodes, S.A. Duncan, D. Monris (succeeding S.A. Duncan) and K.A Suckling. Many other Surveyors generally assisted the Sub-Committee and acted as replacements during the temporary absence of certain members of the Sub-Committee. 2 Preface to 1s t Edition (Metric) 1976 The Institution of Surveyors (Malaysia) in conjunction with Jabatan Kerja Raya has agreed to convert the present Standard Method of Measurement of Building Works to Metric Edition in early 1976 for the adoption and the use of Metric System in Malaysia The Joint Committee is made up of the Chaimman of the Quantity Surveying Sectional Comminee of the Institution of Surveyors (Malaysia), two Members representing Jabatan Kerja Raya and two Members representing Institution of Surveyors (Malaysia). The Joint Committee was instructed by the Institution to produce the Standard Method of st Measurement of Building Works 1 Edition (Metnc) in line with the existing Standard Method of Measurement and any improvement and revision will be done subsequently. This Edition is not a straight conversion from Imperial measurement to metric as the Joint Committee has deliberated at the several meetings to arrive at measurements for practical purposes and usage with regards to materials and labour in Malaysia. After severai sittings, the draft was duly completed and copies forwarded to the Institution of Surveyors (Malaysia) and Jabatan Kerja Raya for their comments before final printing. In submitting this 1st Edition (Metric) of the Standard Method of Measurement of Building Works, for use in Malaysia, the Joint Committee hope that this publication will be a guide for the construction industry until such time the Standard Method of Measurement is revised. The members of the Joint Committee are Tuan Haji Mohd Isahak Mohd Yusuf (Chairman), Encik Cheah Kow Chye (Honorary Secretary), Encik Hashim Sikan, KMN, Encik Abdul Rahman Abdullah and Encik Loh Siow King. 3 CONTENTS A General Rules 7 B Preliminaries 10 Preliminaries particulars 10 Contract 10 Works, goods and materials by others 12 General facilities and obligations 13 Contingencies 13 C Demolition 14 Generally 14 D Excavation and Earthwork 16 Generally 16 Site preparation 16 Excavation 17 Earthwork support 19 Disposal of water 19 Disposal of excavated material 19 Filling 20 E Piling and Diaphragm Walling 22 Piling 22 Diaphragm walls 25 F Concrete Work 27 In-situ concrete 27 Reinforcement 30 Formwork 32 Precast concrete 36 Composite construction 37 Hollow- block suspended constnuction 38 Prestressed concnete work 39 Contractor-designed construction 41 G Brickwork and Blockwork 43 Generally 43 Brickwork 44 Bhck facework 45 Brickwork in connection with boilens 46 Blockwork 48 Damp-proof courses 49 Sundries 50 H Underpinning 53 Generally 53 Work in all trades 53 J Masonry Generally 55 Dressed natural stonework 56 Natural stone rubble work 61 Cast stonework 63 Clayware work 64 Sundries 64 Centering 65 4 K Waterproofi ng and Asphalt work 66 Generally 66 L Roofing 69 Generally 69 Slate or tile roofing 69 Corrugated or troughed sheet roofing or cladding 71 Roof decking 72 Bitumen-felt roofing 73 Sheet metal roofing 74 Sheet metal flashings and gutters 76 M Woodwork 78 Generally 78 Carcassing 79 First fixings . 79 Second fixings 81 Composite items 82 Sundries 84 Ironmongery 85 N Structural Steelwork 86 Generally 86 Steelwork 86 Other structural metaiwork 89 P Metalwork 90 Generally 90 Composite items 90 Plates, bars, etc. . . 92 Sheet metal, wiremesh and expanded metal 93 Holes, bolts, screws and rivets 93 Q Plumbing and Mechanical Engineering Installations 94 Generally 94 Gutterwork 95 Pipework 96 Ductwork 99 Equipment and ancillaries 100 Insulation 101 Sundries 102 Builder's work 103 R Electrical Installations 105 Generally 105 Equipment and control gear 106 Fittings and accessories 107 Conduit, tnunking and cable trays 108 Cables 109 Final sub-circuits 110 Earthing 110 Ancillaries 111 Sundries 111 Builder's work 112 5 S Floor, Wall and Ceiling Finishings 114 Generally 114 In-situfinishings 115 Beds and backings 117 Tile, slab and block finishings 117 Flexible sheet finishings 118 Dry linings and paNitions 118 Suspended ceilings, linings and suppoN work 119 Fibrous plaster 120 Fitted carpeting 121 T Glazing 123 Generally 123 Glass in openings 123 Leaded lights and oopper lights in openings 125 Minrons 125 Patentglazing 125 Domelights 126 Glass 310cks 126 U Painting and decorating 127 Generally 127 Painting, polishing and similar work 127 Signwriting 130 Decorative paper, sheet plastic or fabric backing and lining 130 V Drainage 131 Generally 131 Drains 131 Sumps, manholes, soakaways, cesspits, septic tanks, imhoff tanks and the like 132 Connections to mains 133 Testing drains 133 W Fencing,Turfing and Planting 134 Fencing 134 Open type fencing 134 Close type fencing 135 Gates 136 Sundries 136 Seeding and turfing 136 Planting 137 6 SECTION A GENERAL RULES A.1 Introduction This Standard Method of Measurement provides a uniform basis for measuring building works and embodies the essentials of good practice but more detailed information than is required by this document shall be given where necessary (e.g. in descriptions or preambles, certain specification information including limits on tolerance imposed by the designer) in order to detne the precise nature and extent of the required work. This Standard Method of Measurement shall apply equally to both proposed and executed works. A.2 Bills of Quantities Bills of quantities shall fully describe and accurately represent the quantity and quality of the works to be carried out. Work which cannot be measured shall be given as a provisional sum. Work the extent of which is not known shall be described as provisional or given in a bill of approximate quantities. Rules of measurement adopted for work not covered by these rules shall be stated and such rules shall as far as possible conform with those given in this document for similar work. A.3 Measurement Unless the term metre used in this document is preceded by the words square or cubic it shall be deemed to be linear. Unless otherwise stated, works shall be measured net as fixed in position and each measurement shall be taken to the nearest 10mm (i.e. 5mm and over shall be regarded as 10mm and less than 5mm shall be disregarded). This rule shall not apply to any dimensions stated in descriptions. Unless otherwise stated, where minimum deductions of voids are dealt with in this document they shall refer only to openings or wants which are within the boundaries of measured areas. Openings or wants which are at the boundaries of measured areas shall always be the subject of deduction irrespective of size. The use of hyphen between two dimensions in this document or in a bill of quantities shall mean a range of dimensions exceeding the first dimension stated but not exceeding the second. A.4 Description The order of stating dimensions in descriptions shall be consistent and generally in the sequence of length, width and height. Where that sequence is not appropriate or where ambiguity could arise, the dimensions shall be specificaily identified. Unless otherwise stated in the bill or herein, the following shall be deemed to be included with all items: a.Labour and all costs in connection therewith. 7 A.4 Description (cont'd) Materials, goods and all costs in connection therewith such as conveyance, delivery, unloading, storing, returning packings, handling, hoisting, lowering, etc. Assembling, fitting and fixing materials and goods in position. Plant and all costs in connection therewith. Waste of materials. All cuttings. Establishment charges, overhead charges and profit. Junctions between straight and curved work shall in all cases be deemed to be included with the work in which they occur. Notwithstanding the provisions in this document for labours to be given as linear items, such labour may be giv展开阅读全文
咨信网温馨提示:1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前可先查看【教您几个在下载文档中可以更好的避免被坑】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时联系平台进行协调解决,联系【微信客服】、【QQ客服】,若有其他问题请点击或扫码反馈【服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【版权申诉】”,意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:0574-28810668;投诉电话:18658249818。




马来西亚建筑工程标准计量规则第二版(英文版).doc



实名认证













自信AI助手
















微信客服
客服QQ
发送邮件
意见反馈



链接地址:https://www.zixin.com.cn/doc/4655831.html