木跳板动火要求概要.pptx
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 跳板 动火 要求 概要
- 资源描述:
-
防火计划适用于所有在满堂管廊吊架木跳板平台上热工作的要求目录1 目的2 范围3 参考4 计划和要求 5 看火人职责 6 检查与审核1.0 目的随着管廊上管线安装的开始,在吊架木跳板平台上的热工作与日俱增,为杜绝和减少火灾风险和损失,所有在木跳板脚手架平台的热工作都要遵守此规定。(热工作包括:电焊、气焊、打磨切割等)With the piping erection on pipe rack,more and more hot works will be carried out above the suspension wooden platform,in order to reduce the fire risk and mitigate the lost,all hot work activity on wooden deck shall be strictly controlled according to this plan.2.0 范围 凡是从事此计划范围内的作业的施工班组、工区,要求严格执行此类规定。All construction team who involved in hot work shall be familiar with this plan and make adequate preparation prior to work commencing.4.0 计划和程序Plan and procedure 4.1 消防培训Fire prevention Training 凡是在木跳板平台上进行热工作的员工要求都参加防火和消防培训,所涉及工种:电焊工、管工、监督人员、辅助工种Employees involved working on the full boards scaffold platform are required to participate fire prevention and fire fighting program training,this includes:welder pipe fittersupervisorsgeneral worker 热工作时必须安排指定的看火人全程看护,看火人必须参加防火培训并证明是合格人员。Nominated/dedicated Fire Watchers are competent and participate fire prevention and fire fighting training.所有参加该工作的员工要求通过培训或每日的工作指令会议熟悉该计划。Employees involved shall be familiar with this plan via training and TBT.防火意识和更新培训应定期进行,保证每季度至少一次。Fresh Training about hot work safety will be held frequently to improve awareness or according to analysis of field real condition.员工要求清楚的了解并掌握:Employees must know the location and,have been trained in the correct use of:正确使用消防设备,如使用灭火器、布置消防桶Fire extinguishing equipment.如何回报火险和火灾事件How to report fire incident.每个作业区的逃生路线和消防通道Escape routes and fire exits.紧急集合点的位置Muster points.警报响后,关闭正在使用的机械设备Equipment stopping once the alarm activate.4.2 消防设备的配备Fire prevention facility and provision 要提供充足的消防设施,例如:灭火器、消防水桶、防火布、防火毯、接火盆等,所有设施都要求完好合适Sufficient fire prevention facilities such as:fire extinguishers,fire water barrels,fire retardant blanket,sparks containers/boxes,shall be adequate and sufficient.4.2.1 木跳板平台上的灭火器和其它消防设备要按照以下要求布置Arrangement of Fixed fire prevention facility should be well organized as following 灭火器Fire extinguishers 沿着管廊方向,每间隔30米放置一具8公斤ABC干粉灭火器,灭火器布置方式交错布置,放置挂在钢结构柱子处,易于拿取。即:一旦有火险,任何地点在15米范围内都有灭火器配置。灭火器要求有项目的统一编号,放置地点要求明确标示。HSE监督人员要定期检查和维护灭火器,并在过期日前七天进行更换。Fire extinguishers(ABC powder 8kg)is to be placed next to column in a zigzag order along the pipe rack on the full board scaffolding platform,intervals between 2 fire extinguishers is less than 30meters,so it can facilitate the user to obtain within 15meters.Fire extinguisher will be hung on the steel column 50cm above scaffold board.Fire extinguisher(with inventory Number and location indication)is required to be periodically inspected by Area HSE supervisor and replaced by valid one,at minimum 7days before its expired date.Inspection records and maintenance records are to be kept in HSE Dept.水桶的布置Water barrel 在每两个灭火器之间的柱子之处,放置消防水桶一具,水桶放在管廊边缘牢固固定,便于加水。各主管施工队要安排专人对所辖区域内的水桶定期加水,保持时常水满。At the middle of 2 fire extinguisher interval,water barrel(bucket)is to be placed next to the column.Barrels will be laid at edge of platform for easy water refilling.Construction team shall assign dedicated person to ensure all barrels is full of water,after water using out,it shall be refilled in a duly manner.区域HSE监督人员要求每天监督消防水桶存水情况,并及时提供反馈与采取合理措施Area HSE supervisor is required to monitor the fire bucket status daily.请参考下面布置图LAYOUT Of fixed barrels and fire extinguishers please see sketches LAYOUT Of fixed barrels and fire extinguishers 水桶灭火器水车水车Water truck 施工经理应确保水车时刻状态完好,并制定合理的加水日程计划 Construction manager shall ensure water truck in a good service manner and establish water filling schedule.施工调度应按照计划安排水车提供水源,并且保证在紧急情况能及时调配。Equipment/vehicle dispatcher are responsible for routine water filling service done according to schedule,also to ensure the truck available and in a timely manner in case of fire emergency.接火盆接火盆Sparks container/Tray 用铝皮或其它薄金属板做成开口的箱式形状,用于接纳飞溅的火花,防止其落到木跳板及其它易燃物上 接火盆作为首要的火花接挡措施,去接纳收集火花。Aluminum or other metallic panel could be fabricated into open-box in a rectangular shape,it looks like a metalic tray.this spark container will be placed under the welding/cutting position to collect falling sparks,avoiding sparks dropping on the wooden deck,it could be as the first prevention measure to capture ignition particles.每一名电焊工应配备至少一具接火盆Worker who carries out welding/gas cutting job will be equipped with this sparks container.防火布防火布Fire retardant blanket 防止火花直接坠落到木质跳板上,隔离火花和易燃物,防火布要求防火、阻燃不燃,这是一种非常有效的火花控制方式,也是一种强制要求采取的措施。To prevent splashing sparks drop through the gap of scaffold boards and avoid any wooden board ignition by sparks,fire blanket or fire retardant material is a effective and mandatory measure to be taken when hot work carrying out on wooden deck.焊接防风棚、木跳板上的防火遮盖都要求使用防火布Welding shelter shall be covered with fire retardant material,such as:steel panel,fire blanket.Flammable material is not allowed to use.Fire/spark screen could be made with metal skeleton with fire blanket to prevent sparks flying.4.3 基本要求Basic safety require 以下5个步骤是在木质脚手架跳板上作业的强制也是基本要求:首先清理动火影响区域的易燃可燃物 用水浇湿焊接点下方的木板 在焊接点下方铺防火布,大小根据作业性质现场确定 在防火布上放置接火盆,接火盆原则上离焊缝越近越好 看火人和灭火器要到位4.4文明施工要求 Housekeeping 脚手架木质跳板平台上要 始终 保持干净,无杂物、无施工垃圾。各工区要求安排专人进行施工垃圾的清理,并且将文明施工任务落实到每名员工,要求每天下班之前都要进行文明施工.HSE和施工监督要求对该区域的文明施工情况进行监督,并且采取合理的措施。施工经理要求提供专人对所辖区域的文明施工进行负责。文明施工小组成员的数量应根据现场实际来确定。4.5 electric safety 用电安全 热工作所用的电线、电动工具、电焊等设备设施,每名使用者在作业前要对自己所用工具、线类进行检查确认,确保合格并有当月色标。禁止使用有缺陷的电缆、插座、插头或焊机.禁止将电源线、电焊把线直接固定在钢结构框架、护栏、脚手架护栏等金属结构上,如需,必须采取合理的绝缘措施(如用软胶皮将电缆固定点包裹后再栓挂电缆,禁止使用铁线、钢丝、电焊条捆绑电缆)Insulation measure must be taken when the cable attached by metallic structure.电缆要始终遵循“贴边、走直线、不挡通道”的原则,并且将电缆远离易燃物。施工工长要求确保每名焊工、管工等用电作业的员工,在下班时必须将电器电源关闭。电焊二次线线夹禁止夹在脚手架杆上、钢结构柱子、梁等,要求将其夹在所焊接的部件上。Welding earthing cable shall be attached welding piece properly rather than attach scaffolding tubes,steel structures.电焊把钳要求完好无损,在不焊接时,移除焊把上的焊条。Ensure all welding torches in intact without any defect,remove the welding rod after welding.电焊把线所经过的路线要求无易燃物。route of cables shall be clear from the flammable/combustible material.lighting system 夜间照明夜间照明 Considering night work and working carrying out in dark/dim surroundings,lighting system is to be installed inside the pipe racks,to prevent any combustible material caught fire/ignition by high temperature of halogen lamps or wooden board burnt by dropping lamps when it is energized.Following measures shall be taken:考虑到夜间工作的环境比较昏暗,因此需要安装照明系统,照明系统要在管架内安装,防止易燃材料被高温的卤素灯点着,或木板被废弃的灯管烧毁。具体步骤如下:Competent electrician is responsible for lamp condition inspection and ensure them in good condition,particularly to guaranty the electric wire core diameter is sufficient for the rated current,the bracket of the lamp could be properly fixed with steel wire or special accessory on the beams above wooden deck.一名合格的电工会负责灯泡的检查,确保它们处于良好状态,特别是保证电力线芯直径有足够的额定电流时,灯的支架可以用钢丝或特殊的附件固定在木质的横梁上。Joint inspection is to be done by TP and JCC HSE&construction team after lighting system installation in place prior to service.照明系统安装完,需要有TP、JCC的施工安全小组联合检查合格后,才能投入使用。Electric cable of lamps are required to hanging on the structure with insulation measures,to keep as far as possible from the wooden deck of upper level,it is not allowed to block the passage way.灯的电缆必须挂在绝缘的结构上,尽可能远离上层的木质甲板,并且不要堵塞通道。Lighting system will be checked by the area appointed electrician daily to ensure it under control.照明系统需经过特定的电工每天检查,以确保其安全性。HSE supervisor for night shift is required to confirm the lighting condition and its stability to prevent any fire risk exist.夜班安全员要随时检查照明系统的安全情况,提前预防火灾事故的发生。Risk of fire by dropping lamp will be cascaded to Workers,supervisors by safety training before hot work commencing on the wooden board,stress this risk and countermeasure to workforce in Ti-STARRT.火通过降低灯泡的风险会前热作起了木板,压力这种风险与对策劳动力的Ti-STARRT级联到工人,监事进行安全培训。5.0 Fire watch man responsibility Fire watchers will not leave the assigned post for any reason unless work has been stopped and/or they are replaced by another trained fire watcher.除非热工作结束或者是替换一名看火人,否则的话,看火人绝对不允许离开动火地点。Fire watchers must be fully capable of informing others of emergency conditions and of understanding their requirements.看火人必须有应急反应能力,并且十分了解他们的职责所在。The fire watch will be responsible for barricading the area,if required by the permit,and for keeping other personnel from walking beneath overhead work or exposing themselves to potential hazards.看火人应对整个围护区域负责,防止他人误闯入施工区域,造成不必要的伤害。The fire watch will continually monitor the surrounding area to ensure that no potentially hazardous situations or changing conditions exist,such as pulling samples from a hydrocarbon stream,a gas release,etc.看火人要一直监控动火周边环境,以确保没有潜在危险的发生或变化的条件存在,如从烃流,气体释放等潜在危险。In the event of such changing environments,the fire watch will immediately stop all hot work until the area is again made safe to work in,as verified by the HSE Manager.在这种环境不断变化的情况下,看火人将立即停止一切动火作业,直到安全经理确认该地区可以恢复安全。In the event of a fire,the fire watch will extinguish the fire(if it is clearly within the capacity of the equipment available)otherwise,will activate emergency report or Systems.一旦发生火情,看火人要第一时间使用灭火设备将火扑灭(在能力范围内的火情),否则的话,启动应急报告和系统。The fire watch will remain at the worksite for at least 30 minutes after hot work activities have stopped to ensure that no smoldering embers or slag exist.动火作业结束后的半小时内,看火人不要离开岗位,应确保没有余烬或阴火。Upon completion of the job,and after the determination has been made that no smoldering fires are present;the fire watch will return the fire protection equipment to its original location.The HSE Department will be notified if any fire extinguishers are used.动火完全结束后,需要认真检查,确定没有余烬或阴火。看火人将灭火设备送回原位。所有灭火设备的取用需要在安全部记录。6.0 Inspection and audit Construction supervisor is responsible for this plan implementation and carrying out routine inspection,timely rectification and corrective action required once discrepancy observed.施工监理负责制定和实施计划,并进行例行检查,一旦发现问题,则及时整改,并要求采取纠正措施。HSE supervisor/officer shall carry out daily inspection on fire prevention control,to check all necessary prevention facility and watcher and ensure them in place.HSE主管/高级人员应当对消防控制日常检查,要检查所有必要的预防设施和看火人,并确保各项防火工作开展到位。Special inspection will be done Weekly during walkthrough,corrective action is needed be taken immediately.每周三安全巡检所指出的问题,要及时的修复整改。Periodical internal audit(every 3 month)shall be done to check the hot work safety implementation for continuous improving.每三个月要做内部审计,检查热工作的整改情况。展开阅读全文
咨信网温馨提示:1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前可先查看【教您几个在下载文档中可以更好的避免被坑】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时联系平台进行协调解决,联系【微信客服】、【QQ客服】,若有其他问题请点击或扫码反馈【服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【版权申诉】”,意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:0574-28810668;投诉电话:18658249818。




木跳板动火要求概要.pptx



实名认证













自信AI助手
















微信客服
客服QQ
发送邮件
意见反馈



链接地址:https://www.zixin.com.cn/doc/4228044.html