RFC-反应流程图(ppt文档).ppt
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- RFC 反应 流程图 ppt 文档
- 资源描述:
-
反应流程图反应流程图 Response Flow Checklist2PCS ElementsCreate Measurement PlanEstablish Monitor(SPC)Implement Response Flow Checklist(RFC)Element 1Element 2Element 33ContentsIntroductionWhat is an RFC?Benefits of Using an RFCWhen Should an RFC be Used?Developing an RFCDocumentation of RFC ResultsRFC Storage and RetentionRFC Continuous Improvement GuidelinesRFC Expectations4What is an RFC?A document to contain suspect product and return the process/equipment to a productive state as quickly as possible.Composed of defined set of tasks(action items)to be performed in specific orderRequires certain decisions to be made to find solution to the problem and therefore may lead to two or more different solutions depending on the scenario.5RFC Structure”Diagnosis activities are used first to determine the cause of the process instability.For each possible cause,there is a set of remedy activities that are used to fix the problem once the cause has been determined.”Verification activity is the final step.It is performed to make sure that the process problem has been fixed.6Example of an RFC(Flowchart Type)Exposed Copper Monitoring RFCSpec xx-xxxxDecisionActionEndStartContinueForm Rev ACRev Date:12/20/97Page 1 of 1MS/MT/OperatorTechnicianMfg SupervisorTop-up/Dilute chemical per Shift Engr.instruction and document it in chemical analysis recording bookCheck Deflash and Descale concentration YesWithin specwindow?NoCheck 1)Deflash rectifier2)Titanium anode plate3)Oil contamination in HP tank4)Excessive mold/resin bleed outVerify with dummyNoDocument it and inform Shift supt.YesExposed copper?YesNoRectify the problem accordingly&document it in recording bookWithin specwindow?Inform Proc./Equip.EngineerVerify with dummyNoDocument it and inform Shift supt.YesExposecopper?Exposed copperYesWithin specwindow?NoAAABBUpdateon-hold lotsin shiftly reportLast Block:Engg actions/comments:_-_Endorse RFC to Mfg for filing.7Benefits of Using an RFCIdentifies cause of process or equipment failuresControl charts and SPC trend rules tell us only when the process is out-of-control,not why it is out-of-control.They cannot tell us what to do to fix the problem,either.For that,we need the RFC.Leads Mfg Technician/Specialist through steps in solving the problem in the quickest possible timeMinimal need for Engineering involvementDocuments problem cause and resolution history8When Should an RFC be Created?Statistical process control When an out-of-control(OOC)condition occurredProduct quality and yield controlWhen questionable products are detected at any stationWhen low yielding lots are seen at any stationProcess/Equipment failureFor restoring a machine to production after it has been shut down due to a process/equipment related failure9PCSSPCProcess/Equipmentmaintenance and controlsProductQuality and YieldRFCViolations?e.g.,out-of-control(OOC)pointsLow yield ordiscrepant materials?(i.e.,less thandefined/agreedgoals)Failures?e.g.,missing units,process/equipment monitorproblems such as ball shear failure,temperature problems,etc.FMEARFC Model10Who Develops the RFC?Initiated and led by the process or equipment owner(e.g.,Module Engineer)in a team environmentRFC Development Team should include the following:Process/Equipment EngineersProduct EngineersQ&R EngineersMaintenance TechniciansManufacturing personnelqShift Managers,Mfg Supervisors,MS/MT/OperatorStatisticiansContent experts11RFC Development Flow12Step 1:Brainstorm potential causesUsing a Fishbone diagram,brainstorm all the possible causes of out-of-control signals for the process step.Consider 5M+E factors.Use any existing data or experience on causes of out-of-control incidents.Augment the list with all applicable causes from other existing RFCs for similar parameters.Dont forget to include some of the less obvious ones,such as gauge instability,calculation errors,or plotting errors.Use FMEA when available.13Step 1:Brainstorm potential causes(cont)Example:Problem:Missing unitsPotential causes:Incomplete lot identifier Improper staging of lot Counting SOP violation Equipment jamming Wrong information on ticket14Step 2:Assess likelihood and easeEstablish basis for initial ordering of potential causesLikelihood of being the cause of the problemEase of checkingUse Likely/Ease matrixScore each potential cause on a scale of 1 to 5Do not consider difficulty of fixing the problemFor each potential cause,add Likelihood and Ease scores to get an overall score15Example:Missing units Likely/Ease Matrix Scale:Likely1-Likely to be the cause 5-Unlikely to be the causeEase1-Easy to check 5-Difficult to checkPotentialCauseLikelyEaseSumCountingSOP violation314Equipmentjamming325Incompletelot identifiers112Wronginformationon ticket527Improperstaging of lot224Step 2:Assess likelihood and ease(cont)16Step 3:Create overall RFC process flowRank each potential cause according to its total Likely/Ease score(i.e.,lowest total score has highest priority).Examine the prioritized list for logical ordering and grouping.Similar problem causes can be investigated simultaneously or in combined actions.Avoid redundancy.Actions should be grouped by users:MS/MT/Operator,Technician,Engineer.Examine the ordering from other existing similar or related RFCs.One suggestion is to start with calculation and plotting error checking.Next should be measurement procedure/equipment checking.It is best to rule out possible data/plotting/measurement errors first,before we tamper with the machine or process itself.If the FMEA has been used as a basis in Step 1,the FMEA occurrence number should also be used as a reference in assigning likelihood and ease scores.17Step 3:Create overall RFC process flow(cont)Example:Missing units Initial flow based on Likely/Ease overall score:1.Incomplete lot identifiers highest priority2.Counting SOP violation3.Improper staging of lots4.Equipment jamming5.Wrong information on tickets lowest priority18EXERCISE 1In groups of 4 to 5 people:Identify a problem common to the groupCreate an initial RFC using Steps 1 to 3Choose a reporterPresent to the class after 20 minutes19Definition of TermsACTION-specific instructions telling the RFC User what tasks to perform nextAvoid redundant actions,be specificClarify ownership of the actionCluster ownership of actions,avoid bouncing between ownersDATA-information collected by the RFC UserIncludes observations and measurements20Definition of TermsQUESTION-requires the RFC User to evaluate the data against specific criteriaUse questions that require yes/no responseAvoid subjective questionsRESPONSE-what action should the RFC User take based on the evaluation of the dataEnsure all responses lead to an action21Step 4:Create detailed RFC process flowList all steps required for the following:Determine if potential cause existsFix potential causeTest and verify fixUse flow diagram to communicate the logical flow of the RFC.When creating flow for fixing the problem,Utilize synergy from other RFCs in wording and descriptions.Actions must be absolutely clear.Avoid ambiguity.The decision flow may stop when all Operator-verifiable causes have been exhausted.Many checklists may continue through Technician-verifiable(or even Engineer-verifiable)causes as well.Examine the overall decision flow for completeness and logic.Check for infinite loops and dead ends.Modify if needed.22Check/verifyall lot identifiersAll lot identifiers tally?NoYesContinue productionMake necessary changeson wrong identifier/sDispo lot through proper channel(next potential cause)All lot identifiers tally?NoYes(next potentialcause)Example:Missing unitsStep 4:Create detailed RFC process flow(cont)23Step 5:Compose the RFCTranslate the detailed flow created in Step 4 into an RFC draft.An action for verifying if process/equipment is up for production when a final solution is achieved should always be included in the RFC.Include instructions for re-starting the process.If the accept criteria specified in the verification procedure have been satisfied,it is safe to assume that the problem has been solved.Otherwise,it must be assumed that the problem has not yet been fixed.If out-of-spec processing could have occurred,the RFC may reference the applicable spec or disposition procedures.However,the disposition procedure should not appear in the RFC.Verification of process/equipment status can be done in two ways:qRun a certain number of unitsqUse 2-sigma limit rule24Step 5:Compose the RFC (cont)Block 16Process 100 units froma production lot.Block 16Is the total numberof rejects/=1?YesNo(next steps)Last Block:Engg actions_Endorse RFC to Mfg for filing.Running a certain number of unitsQuantity to be processed for verification is determined by the RFC Development Team and should be specified in the RFCVerification/monitoring should be required after running the units to determine whether to resume production or not.25Step 5:Compose the RFC (cont)Out-of-control Point“Verification”Point+3 Sigma-3 Sigma+2 Sigma-2 SigmaCenterline“VerificationZone”2-Sigma Limit RuleIf next control chart point is within 2-sigma limits,it is safe to assume that the problem has been solvedqAll succeeding control chart points will follow the standard 3-sigma limit ruleOtherwise,it must be assumed that the problem has not been fixed and continue using the RFC to diagnose and fix the problem26Step 5:Compose the RFC (cont)Last Block:Engineering actions_Endorse RFC to Mfg for filing.The last RFC action should state whether the RFC was successful in finding the problem cause.It describes final engineering actions taken when the RFC is not successfulDesignates that the action owner is the EngineerIf applicable,it instructs the Engineer to return the RFC to the MS/MT/OperatorUse the hexagon toolExample:27Step 5:Compose the RFC(cont)The RFC Development Team is responsible for determining if the RFC actions taken need to be documented for passdown and traceability purposes.For RFC actions taken that need to be documented:Create a cover sheet only if requirement is paper-based documentation.qThe following information are required to be supplied by the primary RFC User if applicable:equipment number,lot numbers affected,lead count,date/shift/time problem was encountered,Employee ID of MS/MT/Operator and/or Technician.qThe cover sheet should contain required RFC instructions as well as include RFC trigger point,i.e.,when to use the RFC.If electronic documentation (e.g.,automated RFC tool,EDC)is required,it should capture the same information as listed above.28Example of an RFC Cover Sheet29Example of a Flowchart RFC(Column Type)DecisionActionEndStartContinueForm Rev ACRev Date:12/20/97Page 1 of 1MS/MT/OperatorTechnicianMfg SupervisorTop-up/Dilute chemical per Shift Engr.instruction and document it in chemical analysis recording bookCheck Deflash and Descale concentration YesWithin specwindow?NoCheck 1)Deflash rectifier2)Titanium anode plate3)Oil contamination in HP tank4)Excessive mold/resin bleed outVerify with dummyNoDocument it and inform Shift supt.YesExposed copper?YesNoRectify the problem accordingly&document it in recording bookWithin specwindow?Inform Proc./Equip.EngineerVerify with dummyNoDocument it and inform Shift supt.YesExposecopper?Exposed copperYesWithin specwindow?NoAAABBUpdateon-hold lotsin shiftly reportLast Block:Engg actions/comments:_-_Endorse RFC to Mfg for filing.30Splash checklist-confirm rejectsLast block:Engg actions/comments:_Endorse RFC to Mfg for filing.Form Rev AARev Date 12/16/97Page 1 of 1Hermetic Lid Seal Splash RFCSpec 15-608Example of a Flowchart RFC(Conventional Type)31EXERCISE 2Using the same grouping as in Exercise A:Complete the RFC flow following Steps 4 to 5Choose a reporterPresent to the class after 20 minutes32Step 6:Development Team ReviewReview the RFC to ensure correctnessReview for logic,typographical and other errors,clear and consistent wording,ease-of-use,correct formatting,infinite loops,and dead ends.33Step 7:Publish the RFCIncorporate RFC into a spec and publishThe entire RFC should be documented within the module operating spec or as an attachment.Conduct RFC training to all users and stakeholders34Documentation of RFC ResultsIf requirement is paper-based documentation:For every action item completed,RFC User toSign outside of the tool diagram for a flowchart type RFCSign outside of the“Initial”column for a tabular type RFCWhether requirement is paper-based or electronic documentation,RFC User should document the last RFC action completed and corresponding corrective actions.Example:qIn paper control charts,documentation is written on the back of the chart together with comments for the OOC points.qIn EDC,documentation is done in the Annotation portion of the EDC screen.35RFC Storage and RetentionManufacturing,or whichever group the primary RFC User belongs to,is responsible for creating a storage and retention system for documented RFC actions.Retention period for documented RFC actions must be defined.36RFC Continuous ImprovementRFC has to be reviewed periodically for improvement on documented periodic basis or whenever there is any change in the process/equipment.Check effectiveness of defined RFC action itemsEvaluate performance of machine affectedReview overall RFC usageAssess success of RFC in finding the problemRFC Owner is responsible for reviewing the RFC.RFC must be revised/updated when found to be ineffective or insufficient during the review.37 A B C D E F Last Action Completed in RFCFrequencyContinuous Improvement GuidelinesCheck effectiveness of defined RFC Action ItemsMake a frequency chart to show how many times the RFC stopped at each action item.qDoes a high frequency Last Action Completed indicate a processing,procedural,or equipment change is in order to prevent the problem?qShould a specific Action be moved closer to the front of the RFC?qDoes the problem description and solution listed under the Last Action Completed accurately reflect the actual problem and what was done to resolve it?38Continuous Improvement Guidelines(cont)Evaluate performance of machine affectedDoes the same machine#have all or most of the problems?Are the problems spread equally among all the machines?Look if there are time patterns.What do these indicate?Example:Do most of the RFCs in March stopped at Action C?Do most of the RFCs from Shift 1 stopped at Action E?39Continuous Improvement Guidelines(cont)Review overall RFC usageIs it time to remove“never used”Action Items from the RFC?Could process improvement be made based on the RFC data?Does the report highlight something that should not be part of the RFC?40Continuous Improvement Guidelines(cont)Assess success of RFC in finding the problemHow many times where the MS/MT/Operator successful in bringing the process/equipment“back up to production”without Engineering assistance?%Effectiveness=100*(#of RFC fixes by MS/MT/Operator)Total#of RFCs usedCan some skills/responsibilities be transferred from MS/MT/Operator to Engineering or vice versa?Does the RFC work successfully?Do展开阅读全文
咨信网温馨提示:1、咨信平台为文档C2C交易模式,即用户上传的文档直接被用户下载,收益归上传人(含作者)所有;本站仅是提供信息存储空间和展示预览,仅对用户上传内容的表现方式做保护处理,对上载内容不做任何修改或编辑。所展示的作品文档包括内容和图片全部来源于网络用户和作者上传投稿,我们不确定上传用户享有完全著作权,根据《信息网络传播权保护条例》,如果侵犯了您的版权、权益或隐私,请联系我们,核实后会尽快下架及时删除,并可随时和客服了解处理情况,尊重保护知识产权我们共同努力。
2、文档的总页数、文档格式和文档大小以系统显示为准(内容中显示的页数不一定正确),网站客服只以系统显示的页数、文件格式、文档大小作为仲裁依据,个别因单元格分列造成显示页码不一将协商解决,平台无法对文档的真实性、完整性、权威性、准确性、专业性及其观点立场做任何保证或承诺,下载前须认真查看,确认无误后再购买,务必慎重购买;若有违法违纪将进行移交司法处理,若涉侵权平台将进行基本处罚并下架。
3、本站所有内容均由用户上传,付费前请自行鉴别,如您付费,意味着您已接受本站规则且自行承担风险,本站不进行额外附加服务,虚拟产品一经售出概不退款(未进行购买下载可退充值款),文档一经付费(服务费)、不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
4、如你看到网页展示的文档有www.zixin.com.cn水印,是因预览和防盗链等技术需要对页面进行转换压缩成图而已,我们并不对上传的文档进行任何编辑或修改,文档下载后都不会有水印标识(原文档上传前个别存留的除外),下载后原文更清晰;试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓;PPT和DOC文档可被视为“模板”,允许上传人保留章节、目录结构的情况下删减部份的内容;PDF文档不管是原文档转换或图片扫描而得,本站不作要求视为允许,下载前可先查看【教您几个在下载文档中可以更好的避免被坑】。
5、本文档所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用;网站提供的党政主题相关内容(国旗、国徽、党徽--等)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
6、文档遇到问题,请及时联系平台进行协调解决,联系【微信客服】、【QQ客服】,若有其他问题请点击或扫码反馈【服务填表】;文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“【版权申诉】”,意见反馈和侵权处理邮箱:1219186828@qq.com;也可以拔打客服电话:0574-28810668;投诉电话:18658249818。




RFC-反应流程图(ppt文档).ppt



实名认证













自信AI助手
















微信客服
客服QQ
发送邮件
意见反馈



链接地址:https://www.zixin.com.cn/doc/2646162.html