分享
分销 收藏 举报 申诉 / 46

类型APICS资源主计划.ppt

  • 上传人:鼓***
  • 文档编号:14777005
  • 上传时间:2026-11-20
  • 格式:PPT
  • 页数:46
  • 大小:1.54MB
  • 下载积分:8 金币
  • 配套讲稿:

    如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。

    特殊限制:

    部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。

    关 键  词:
    APICS 资源 计划
    资源描述:
    单击此处编辑母版标题样式,单击此处编辑母版文本样式,第二级,第三级,第四级,第五级,APICS资源主计划,Master Planning of Resources,Session 1:The Business Planning Process,Session 2:Forecasting Demand,Session 3:,Demand Management and Customer Service,Session 4:Distribution Planning,Session 5:The Sales and Operations Planning Process,Session 6:The Master Scheduling Process,Session 7:Managing the Master Scheduling Process,Session 8:Measuring Performance and Validatingthe Plan,Sales and Operations Planning,Business planning,Sales and Operations planning,Master Scheduling,Resource planning,Session 5 Objectives,Describe the sales and operations planning process and its relationship within master planning of resources,Explain the role of volume and mix in the sales and operations planning process,Describe the steps in the sales and operations planning process,Distinguish between the terms,sales and operations planning,and,production plan,Identify the participants and the decision-makers in the sales and operations planning process,Describe the inputs and outputs of the sales and operations planning process,Identify and describe production strategies used in sales and operations planning,Identify and briefly describe the steps in the resource planning process,Sales and Operations Planning Relationships,Master,Scheduling,Detailed Scheduling,&Planning,Business,Planning,Production Plan,Source:Adapted from Wallace,Tom F.,Sales and Operations Planning,A How-To Guide,T.F.Wallace&Co.1999.,Sales&Operations Planning,F,O,R,E,C,A,S,T,I,N,G,&,D,E,M,A,N,D,MANAGEMENT,CAPA-CITY,M,A,N,A,G,E,M,E,N,T,RESOURCE PLANNING,Organizations with Separate Plans,Financial,Plan,Business,Plan,Production,Plan,Backlog,Plan,Marketing,Plan,Sales,Plan,Human Resource,Plan,Inventory,Plan,Engineering,Plan,Master Planning of Resources,ver.2.0 December 2001,An Integrated Companywide Plan,Sales,Plan,Financial,Plan,Engineering,Plan,Backlog,Plan,Business,Plan,Production,Plan,Inventory,Plan,Marketing,Plan,Human,Resource,Plan,Sales and Operations Planning,Master Planning of Resources,ver.2.0 December 2001,The Balancing Act,Demand,Supply,Demand,Forecasts,Actual,Orders,Production,Orders,Purchase,Orders,Source:Wallace,Tom F.,Sales and Operations Planning,A How-To Guide,T.F.Wallace&Co.1999.,Product Volume and Mix,Volume,The big picture,How much?,Rates,Product families,Planned within sales and operations planning,Mix,The details,Which ones?,Orders,Individual products,Planned within master scheduling,Source:Wallace,Tom F.,Sales and Operations Planning,A How-To Guide,T.F.Wallace&Co.1999.,Sales and Operations Planning(S&OP),Is a business process,Keeps demand and supply in balance,Is performed at the aggregate level,Focuses on product volume,not mix,Occurs on a monthly cycle,Displays information in product units and financial numbers,The Monthly S&OP Process,Run sales forecast reports,Demand planning,Supply planning,Pre S&OP meeting,Executive S&OP Meeting,1,2,3,4,5,Statistical forecasts,Field sales worksheets,Management forecasts,First pass spreadsheets,Capacity constraints,Second pass spreadsheets,Recommendations and,Agenda for exec.S&OP,Single companywide,plan,Master Planning of Resources,ver.2.0 December 2001,1.Run Sales Forecast Reports,Gather last months data,Gather information for sales and marketing for new forecast,Share information with appropriate people,Source:Wallace,Tom F.,Sales and Operations Planning,A How-To Guide,T.F.Wallace&Co.1999.,Master Planning of Resources,ver.2.0 December 2001,2.Demand Planning Phase,Sales and marketing staff review Step 1 information,Generate a new or updated existing forecast,Forecast includes product families,Forecast includes any product life-cycle changes for the time frame covered by planning horizon,Source:Wallace,Tom F.,Sales and Operations Planning,A How-To Guide,T.F.Wallace&Co.1999.,Master Planning of Resources,ver.2.0 December 2001,3.Supply Planning Phase,Operations staff review Step 2 information,Review current operations plans for possible change,If changes,then operations plans should be revised,Validate revised operations plans using resource planning,Source:Wallace,Tom F.,Sales and Operations Planning,A How-To Guide,T.F.Wallace&Co.1999.,Master Planning of Resources,ver.2.0 December 2001,Source:Wallace,Tom F.,Sales and Operations Planning,A How-To Guide,T.F.Wallace&Co.1999.,4.Pre-S&OP Meeting,Objectives,Make decisions regarding balancing supply and demand,Resolve problems and differencesone set of recommendations,Identify areas where agreement cannot be reached and propose alternative plans,Develop scenarios for alternative plans to solve problems,Master Planning of Resources,ver.2.0 December 2001,4.Pre-S&OP Meeting(cont.),Representatives include:,Sales and marketing,Product development,Finance,Operations,Product manager,Family-by-family review,Check for resource constraints,Review actual vs planned performance,Review inventory/backlog plans,Source:Wallace,Tom F.,Sales and Operations Planning,A How-To Guide,T.F.Wallace&Co.1999.,Master Planning of Resources,ver.2.0 December 2001,4.Pre-S&OP Meeting(cont.),Output includes:,Updated financial plan,Recommended action for each product family,New product introduction plans,Recommendations for changes in resources,Areas of disagreement with alternative plans and impact statements,Recommended changes to demand and supply strategies,Agenda for executive S&OP meeting,Source:Wallace,Tom F.,Sales and Operations Planning,A How-To Guide,T.F.Wallace&Co.1999.,Master Planning of Resources,ver.2.0 December 2001,5.Executive S&OP Meeting,Objectives:,Make decisions on each product family,accept Pre-S&OP team recommendations or alternatives,Authorize production or procurement changes,Compare production plans to business plan and make required adjustments,Make decisions where no agreement on Pre-S&OP team,Review business key performance indicators where performance was less than planned,Source:Wallace,Tom F.,Sales and Operations Planning,A How-To Guide,T.F.Wallace&Co.1999.,Master Planning of Resources,ver.2.0 December 2001,5.Executive S&OP Meeting(cont.),Output:,Meeting minutes,Summary of decisions made,Summarized action plan with due dates and responsibilities,Authorized company game plan,Complete production plan for each product family,Source:Wallace,Tom F.,Sales and Operations Planning,A How-To Guide,T.F.Wallace&Co.1999.,Master Planning of Resources,ver.2.0 December 2001,Benefits of S&OP,Sales and Operations Planning provides:,More effective use of ERP systems,Operational plans consistent with the business plan,A tool for managing a dynamic business on a regular basis,Ability to establish targets and measure performance,A formal process to set targets and measure progress toward improved performance,Increased teamwork and collaborative skills,S&OP Considerations,Product families,Units of measure,Planning horizon,Data element responsibility,Planning process,Participation at meetings,Information needed for meetings,Meeting management,Resource validation,Performance measurement,Approval process,Who will approve the production plan,Who Brings What to the Table?,Marketing,Product,Development,Product,Demand,Capital,MPS and,Supplier,Constraints,Business,Plan,Workforce,Availability,Source:Launchbury,Keith J.,Principles of Planning,Omeric,1999.,Finance,Materials,Operations,Human,Resources,Engineering,Management,Capacity,Product Families,Represent how the product or service is presented to the market,Logical groupings based on similar sales and manufacturing requirements,Should be meaningful in terms of volume of sales generated,Ideally should be no more than 6-12 product families per business unit,Source:Wallace,Tom F.,Sales and Operations Planning,A How-To Guide,T.F.Wallace&Co.1999.,Product/Service Hierarchy,Stock Keeping Unit(SKU),Package Size,Model/Brand,Product Subfamily,Product Family,Business,Unit,Total,Company,Source:Wallace,Tom F.,Sales and Operations Planning,A How-To Guide,T.F.Wallace&Co.1999.,Inputs to S&OP,Input,Responsibility,Projected demandMarketing,Market intelligenceMarketing,Actual salesSales,Capacity informationManufacturing,Management targetsManagement,Financial requirementsFinance,New product informationR&D,New process informationProcess engineering,Workforce availabilityHuman resources,S&OP Outputs,Output,Sales plan,Production plan,Inventory plan,Backlog plan,Financial plan,Product&process development plan,Workforce plan,Responsibility,Marketing and sales,Manufacturing,Materials management,Customer service,Finance,Engineering,Human resources,Level Schedule Strategy,Chase Strategy,Produce only what you sell,Produce products or service just-in-time,If there are no salesdo not produce,Chase Strategy,Combination/Hybrid Strategy,A balance between level and chase,Could be a mixture of both approaches,For example,a producer of ice cream has two production levels,one shift per day during the slow season,two shifts per day during the busy season,Combination/Hybrid Strategy,Make-to-Stock and Make-to-Order,MTS,Sales forecasts are entered formake-to-stock products,Differences between supplyand demand result in changesin inventory level,MTO,Customer orders are enteredfor make-to-order products,Differences between supplyand demand result in changesin backlog level,MTS S&OP Grid,Sales Plan204060801201902401408040901203050,Actual Sales233547,Cumulative Diff.+3-2-15,Production Plan8080100,Difference+3-5-13,Actual Production708090,Difference-100 -10,Cumulative Diff.-10-10-20,Inventory Plan 2080120160,Actual Inventory 2067112155,Difference,-13-8-5,Past,Future,Present,Product Family ADJFMAMJJASONDJ,MTS S&OP ExerciseSolution,Sales Plan204060801201902401408040901203050,Actual Sales233547,Cumulative Diff.+3-2-15,Production Plan808010010012014014014012010080604040,Difference+3-5-13,Actual Production708090,Difference-100 -10,Cumulative Diff.-10-10-20,Inventory Plan 2080120160175175125252565125115556555,Actual Inventory 2067112155,Difference,-13-8-5,Past,Future,Present,Product Family ADJFMAMJJASONDJ,Setting Inventory Target Levels,Management can set inventory targets by product family in the sales and operations planning process such as:,Maximum inventory,Minimum inventory,Inventory turns,Days of coverage,5-,35,MTO S&OP Example,Sales Plan2468121921148491035,Actual Sales357,Cumulative Diff.+1+2+3,Production Plan88108121921148491035,Difference111,Actual Production789,Difference-10 -1,Cumulative Diff.-1-1-2,Backlog Plan 20 141061111111111111111111111,Actual Backlog 20161311,Difference,+2+3+5,Past,Future,Present,Product Family BDJFMAMJJASONDJ,Source:Cox,James F.III,Ph.D.and John H.Blackstone Jr.,APICS Dictionary,Ninth Edition,(1998).,Backlog versus Backorder,Backlog is all customer orders received but not yet shipped,Backorder is a past due customer order or commitment,Backlog includes backorders,Many companies confuse the two terms,Backlog has a future delivery date,A backorder must be replanned,Setting Backlog Target Levels,Management can set target backlog levels by product family in the sales and operations planning process,such as:,maximum backlog,minimum backlog,planned order times,maximum customer waiting time,Anything that adds value to a,product or service in its creation,production,or delivery,What Is a Resource?,Resource Planning,The process of establishing,measuring,and adjusting levels of long-range capacity,Based on the production plan,Addresses those resources that take long periods of time to acquire,or are costly or difficult to add,Requires top management approval,The Resource Planning Process,Develop bills of resources,Decide on units of measure,Determine planned capacity,Calculate the load,on each resource,1,2,3,4,5,Production Plan,6,Compare to planned capacity,Take action where necessary,Bill of Resources,Resource Planning Exercise,5-,43,Resource Planning ExerciseSolution,5-,44,Units of Measure,The unit of measure should be defined in terms of common use of capacity.Some typical examples are,Each,Pair,Cases,Thousands,Reels,Gallons,Feet,Kilograms,Planned Changes in Resources,Acquisitions,Facility startup/shutdown,Hiring,layoffs,shift changes,Adding/removing tooling and equipment maintenance,Outsourcing/subcontracting,
    展开阅读全文

    开通VIP折扣优惠下载文档

    提示  咨信网声明:本文档由用户上传并分享,仅供学习交流、研究之用,未经授权,严禁复制、发行、汇编、翻译或网络传播等,侵权必究。

    咨信网小贴示:
    1、浏览或下载可查看了解,请点击【咨信网告知】。
    2、下载文件中如有侵权或不适当内容,将立即纠正。
    3、如果因为网速或其他原因下载失败请重新下载,重复下载[60天内]不扣币。
    4、开具发票登录电脑端申请,请点击【索取发票】。

    咨信网客服组:【微信客服】

    自信AI创作助手
    关于本文
    本文标题:APICS资源主计划.ppt
    链接地址:https://www.zixin.com.cn/doc/14777005.html

    Copyright ©2010-2026   All Rights Reserved  宁波自信网络信息技术有限公司 版权所有   |  客服电话:0574-28810668    微信客服:咨信网客服    投诉电话:18658249818   

    违法和不良信息举报邮箱:help@zixin.com.cn    文档合作和网站合作邮箱:fuwu@zixin.com.cn    意见反馈和侵权处理邮箱:1219186828@qq.com   | 证照中心

    12321jubao.png12321网络举报中心 电话:010-12321  jubao.png中国互联网举报中心 电话:12377   gongan.png浙公网安备33021202000488号  icp.png浙ICP备2021020529号-1 浙B2-20240490   


    关注我们 :微信公众号  抖音  微博  LOFTER               

    自信网络  |  ZixinNetwork